IndexUNI: Database of University Articles

Cole--Eldon E. (Buildings and Grounds Staff)

Displaying 101 - 124 of 124
Title Date Summary
101 Weather retards work on Commons
College Eye 24:19, p.4
2/10/1933 Work suspended until weather improves; brick work underway; target completion date is late July 1933.
102 Editorials; wounds leave scars
College Eye 24:17, p.2
1/27/1933 E. E. Cole reports that cutting across the grass in winter does more harm than doing the same thing in summer.
103 Burt Welty compares college life of '96 with that of today
Barker--Donald W. (Class of 1935)
College Eye 24:12, p.1
11/28/1932 Donald Barker reflects on the different activities of students now compared to when he was in college.
104 Fall dances and house parties are features of week-end social events
College Eye 24:8, p.3
10/28/1932 Campus social calendar.
105 Two Minutes
College Eye 23:48, p.2
6/30/1932 Criticizes students for taking short cuts through the grass.
106 Juvenile co-ed sprees speedily
College Eye 23:47, p.2
6/24/1932 E. E. Cole's daughter has travel plans.
107 Grandstands will be built this summer; football seats will more than double capacity of the stadium
College Eye 23:45, p.1
6/10/1932 Will also make improvements to Central Hall and put in new sidewalks.
108 Officers of Administration
Old Gold 0:0, p.19
6/1/1932 Photos and descriptions of the officers of administration.
109 Heating plant here will be finished soon; equipment installation begun, states Supt. E. E. Cole; contracts are granted for varied types of apparatus
College Eye 23:33, p.1
3/7/1932 Installation of technical equipment now under way; hope to be ready by October.
110 The installation of equipment
Public Relations News Release 1931:258, p.1
2/25/1932 Work on boiler installation to begin March 1; conveyer and stoker work to begin March 15; alternating current to replace direct current; turbine flook work now under way; hope to have work compete by October 1932.
111 Power plant excavations are complete; all concrete footings and foundation walls will be finished within two weeks, says construction boss
College Eye 23:13, p.1
9/18/1931 Building will cost $90,000; Tapager Construction is general contractor; description of the building; stack will be 197 feet tall.
112 All of the concrete has been poured
Public Relations News Release 1931:5, p.1
9/12/1931 Concrete footings complete; foundation walls to begin soon; steel for shops building is on site; chimney construction let as separate contract.
113 Cole moves to campus
College Eye 23:7, p.4
7/17/1931 Moves into superintendent's house after James Robinson moves out.
114 Has new job
College Eye 23:5, p.1
7/3/1931 E. E. Cole, superintendent of buildings and grounds; photo.
115 E. E. Cole new superintendent
Alumnus 15:3, p.10
7/1/1931 Appointed Superintendent of Buildings and Grounds; succeeds J. E. Robinson.
116 New heating plant
Alumnus 15:3, p.9
7/1/1931 Excavation begins on $365,000 heating plant; hope to be ready by fall 1932; shops, garage buildings, and railroad siding will also be built; building specifications.
117 Work on power plant will begin July 6
College Eye 23:4, p.1
6/26/1931 Laying of water pipes complete; will begin excavation soon.
118 Tapager Construction Company gets general heating plant contract with bid of $88,666
College Eye 23:3, p.1
6/19/1931 Will house power plant, garages, and physical plant facilities; parts to be complete by January 1932; other parts will be ready in fall 1932; designed by E. E. Cole.
119 Cole takes Robinson's post July 1, veteran official ends long period of service as superintendent of the buildings and grounds
College Eye 23:1, p.1
6/6/1931 James Robinson will supervise upkeep of campus and janitorial service; profile of E. E. Cole.
120 E. E. Cole will become superintendent of building and grounds
Public Relations News Release 1930:438, p.1
5/28/1931 Suceeds James E. Robinson, who will supervise janitors and upkeep of college grounds; profile of E. E. Cole.
121 Board of Education approves heating plant for college; new unit includes heating and power plant, shops, and garage buildings
College Eye 22:32, p.1
5/22/1931 $365,000 appropriated; will supply heat and power to campus; to be equipped with stoker; description of the boilers.
122 One of the most familiar landmarks
Public Relations News Release 1930:399, p.1
5/15/1931 Construction of new Power Plant begins around July 1; lengthy description of the new plant and the shops building.
123 Construction of the new $365,000 service unit
Public Relations News Release 1930:397, p.1
5/11/1931 Work will begin July 1 on a new power and heating plant as well as a shops and garage building; E. E. Cole is architect.
124 College officials and students use new blueprint machine
College Eye 22:7, p.4
10/24/1930 Description of the new machine; will be used by students and E. E. Cole.

Pages

Questions about this service?

Contact Jaycie Vos, University Archivist
jaycie.vos@uni.edu | (319) 273-6307

 

1227 W 27th Street
Cedar Falls, Iowa 50614
(319) 273-2838  | LibAskUs@uni.edu