Old Administration Building

Displaying 251 - 300 of 309 in reverse chronological order
# Title Date Summary
251 Work has commenced
Normal Eyte 11:29, p.715
On the connection between the Auditorium Building and the Administration Building.
252 Work on the connecting corridor
Normal Eyte 11:28, p.688
Work on Crossroads well underway.
253 Official
Normal Eyte 9:30, p.708
J. B. Knoepfler will head the new German Department in the fall; state colleges and university have new policy with regard to the use of alcoholic beverages; James E. Robinson will supervise construction of new building; hope to select architect in June.
254 Official: Hon. Edward Townsend; death of an honored citizen widely known and respected
Normal Eyte 9:16, p.375
Lengthy tribute to Edward Townsend and his contributions to ISNS and Cedar Falls.
255 The Normal buildings
Normal Eyte 9:14, p.333
Doors and windows modified.
256 Messrs. McDuffie and Mullin
Normal Eyte 9:1, p.6
Will meet with contractors for bridge between South and Central Halls and for drainage and grading work on Normal Street.
257 The Board of Trustees
Normal Eyte 7:36, p.6
News of recent action including electricity for the chapel, new musical organizations, and contracts with the local school district.
258 State Normal buildings and grounds
Normal Eyte 7:35, p.
Panoramic view from the east; photo.
259 Biennial period, 1895-1897; the President's report
Normal Eyte 7:11, p.123
President Seerley reports on the Special Primary course, the Old Administration Building, the science, geography, and drawing curricula, the Student Battalion, electrical service, and a penmanship course.
260 The wide hall connecting the new building and South Hall
Normal Eyte 7:6, p.69
Pictures displayed there.
261 State Normal buildings
Normal Eyte 6:33, p.386
Panoramic view from the east; photo.
262 The new museum cases
Normal Eyte 6:2, p.15
New rooms assigned to museum collections.
263 Perhaps the greatest change
Normal Eyte 6:2, p.15
Natural science lab fitted up in the third story of the Administration Building; fifteen microscopes added.
264 The new chemical laboratory
Normal Eyte 6:2, p.15
Now located in south room of Administration Building; description of new facilities.
265 Iowa State Normal, Cedar Falls, Iowa
Normal Eyte 5:31, p.297
The ISNS buildings from the east; photo.
266 The report of Miss Anna M. Baker
Normal Eyte 5:26, p.237
Report for the library in its first term in its new location in the Administration Building.
267 The sign, "No admittance to the third floor"
Normal Eyte 5:24, p.223
Third floor of new building now open.
268 The physical culture class
Normal Eyte 5:20, p.184
Enjoying new space in basement of new Administration Building.
269 The new clocks
Normal Eyte 5:16, p.143
Are a great convenience.
270 The new office furniture
Normal Eyte 5:15, p.133
President Seerley enjoying new furniture.
271 Of all the things that make the Normal student rejoice
Normal Eyte 5:15, p.134
Enjoying the library in its new quarters in the new building.
272 The Board of Directors
Normal Eyte 5:14, p.122
Meet in new building.
273 Mr. Fulkerson
Normal Eyte 5:14, p.121
Architect of new building visits campus.
274 Pres. Seerley's class
Normal Eyte 5:13, p.113
Will teach in new building.
275 Mr. Fullerton's music class
Normal Eyte 5:13, p.112
Met in new building.
276 On Friday
Normal Eyte 5:12, p.105
Showed guests the new building.
277 The new central building
Normal Eyte 5:11, p.81
President Seerley gives a lengthy description of the new building, including construction materials and floor plans; two story corridor or bridge connects it with Gilchrist Hall; first and second floors are ready for use; third floor ready in September.
278 The mosaic floor
Normal Eyte 5:5, p.37
Floor in main hallway of new building is finished.
279 The workmen
Normal Eyte 5:5, p.37
Finished installing the vault in the new building.
280 The woodwork
Normal Eyte 5:5, p.37
Being installed in the new building.
281 A suggestion
Normal Eyte 5:4, p.30
Some students think that the new building should be named Seerley Hall.
282 All will be glad to learn
Normal Eyte 5:3, p.21
Woodwork and mosaic flooring in Administration Building being installed.
283 The opening week of school
Normal Eyte 5:1, p.1
Enrollment approaching one thousand; Administration Building should be ready by January 1, 1896; landscaping and drives modified on campus front lawn; steps removed from Central Hall; power plant under construction; teachers deal with crowded classrooms.
284 Our readers abroad
Normal Eyte 5:1, p.7
Plastering on lower floor of Administration Building finished; library may move to new building by end of October.
285 When the old students on their return
Normal Eyte 5:1, p.7
Exterior of new Administration Building is complete; front steps of Central Hall removed; front drive removed; all carriages must go behind building.
286 Untitled
Normal Eyte 4:36, p.564
Engraving of new building; photo.
287 Five years of rapid growth
Normal Eyte 4:36, p.567
Good look at development of College Hill after Boarding Department closed; development of housing and other improvements including Seerley Park.
288 The state is pushing work
Normal Eyte 4:36, p.568
Cartoon shows faculty working on Administration Building.
289 The brick work
Normal Eyte 4:34, p.540
First story of new building nearing completion; have had difficulty in securing lumber.
290 Monday afternoon
Normal Eyte 4:28, p.442
President Seerley and board members meet to decide on heating system for Administration Building.
291 Work is being pushed
Normal Eyte 4:27, p.427
Stone work will soon be done on Administration Building; most material is on site.
292 Untitled
Normal Eyte 4:22, p.345
Engraving of new building, later the Old Administration Building.
293 We are pleased
Normal Eyte 4:22, p.341
Detailed look at plans and progress on the new building (Old Administration); will house library, offices, recitation rooms, gymnasium, natural science department, and museum; corridor will connect the building to Gilchrist Hall.
294 At the beginning of the last term
Normal Eyte 4:15, p.229
Enrollment now 660 students plus sixty-five in the Preparatory Department and sixty-two in the Training School; looking forward to completion of Administration Building; will enrollment reach one thousand?
295 Mr. Editor
Normal Eyte 4:8, p.119
Would like to see the Board support the remodeling and furnishing of literary society rooms.
296 Excavating for the new building is progressing rapidly
Normal Eyte 4:5, p.75
Saturday activities in other buildings cancelled while water pipes were connected.
297 Excavating for the new building
Normal Eyte 4:4, p.57
Will cause detours for students; foundation expected to be finished this fall.
298 The regular term reception
Normal Eyte 4:1, p.12
Hard to find a place large enough to accommodate increased numbers of students; would like reception room in new building.
299 Society halls
Normal Eyte 3:30, p.233
Societies would like dedicated rooms in the new building; Board asks if they would accept rooms on third floor of Central Hall.
300 Y. M. & Y. W. C. A.
Normal Eyte 3:29, p.227
Meeting leaders announced; beginning to think of a new home now that a new building is in store.