Old Administration Building
Displaying 251 - 300 of 309 in reverse chronological order
# | Title | Date | Summary |
---|---|---|---|
251 | Work has commenced Normal Eyte 11:29, p.715 |
On the connection between the Auditorium Building and the Administration Building. | |
252 | Work on the connecting corridor Normal Eyte 11:28, p.688 |
Work on Crossroads well underway. | |
253 | Official Normal Eyte 9:30, p.708 |
J. B. Knoepfler will head the new German Department in the fall; state colleges and university have new policy with regard to the use of alcoholic beverages; James E. Robinson will supervise construction of new building; hope to select architect in June. | |
254 | Official: Hon. Edward Townsend; death of an honored citizen widely known and respected Normal Eyte 9:16, p.375 |
Lengthy tribute to Edward Townsend and his contributions to ISNS and Cedar Falls. | |
255 | The Normal buildings Normal Eyte 9:14, p.333 |
Doors and windows modified. | |
256 | Messrs. McDuffie and Mullin Normal Eyte 9:1, p.6 |
Will meet with contractors for bridge between South and Central Halls and for drainage and grading work on Normal Street. | |
257 | The Board of Trustees Normal Eyte 7:36, p.6 |
News of recent action including electricity for the chapel, new musical organizations, and contracts with the local school district. | |
258 | State Normal buildings and grounds Normal Eyte 7:35, p. |
Panoramic view from the east; photo. | |
259 | Biennial period, 1895-1897; the President's report Normal Eyte 7:11, p.123 |
President Seerley reports on the Special Primary course, the Old Administration Building, the science, geography, and drawing curricula, the Student Battalion, electrical service, and a penmanship course. | |
260 | The wide hall connecting the new building and South Hall Normal Eyte 7:6, p.69 |
Pictures displayed there. | |
261 | State Normal buildings Normal Eyte 6:33, p.386 |
Panoramic view from the east; photo. | |
262 | The new museum cases Normal Eyte 6:2, p.15 |
New rooms assigned to museum collections. | |
263 | Perhaps the greatest change Normal Eyte 6:2, p.15 |
Natural science lab fitted up in the third story of the Administration Building; fifteen microscopes added. | |
264 | The new chemical laboratory Normal Eyte 6:2, p.15 |
Now located in south room of Administration Building; description of new facilities. | |
265 | Iowa State Normal, Cedar Falls, Iowa Normal Eyte 5:31, p.297 |
The ISNS buildings from the east; photo. | |
266 | The report of Miss Anna M. Baker Normal Eyte 5:26, p.237 |
Report for the library in its first term in its new location in the Administration Building. | |
267 | The sign, "No admittance to the third floor" Normal Eyte 5:24, p.223 |
Third floor of new building now open. | |
268 | The physical culture class Normal Eyte 5:20, p.184 |
Enjoying new space in basement of new Administration Building. | |
269 | The new clocks Normal Eyte 5:16, p.143 |
Are a great convenience. | |
270 | The new office furniture Normal Eyte 5:15, p.133 |
President Seerley enjoying new furniture. | |
271 | Of all the things that make the Normal student rejoice Normal Eyte 5:15, p.134 |
Enjoying the library in its new quarters in the new building. | |
272 | The Board of Directors Normal Eyte 5:14, p.122 |
Meet in new building. | |
273 | Mr. Fulkerson Normal Eyte 5:14, p.121 |
Architect of new building visits campus. | |
274 | Pres. Seerley's class Normal Eyte 5:13, p.113 |
Will teach in new building. | |
275 | Mr. Fullerton's music class Normal Eyte 5:13, p.112 |
Met in new building. | |
276 | On Friday Normal Eyte 5:12, p.105 |
Showed guests the new building. | |
277 | The new central building Normal Eyte 5:11, p.81 |
President Seerley gives a lengthy description of the new building, including construction materials and floor plans; two story corridor or bridge connects it with Gilchrist Hall; first and second floors are ready for use; third floor ready in September. | |
278 | The mosaic floor Normal Eyte 5:5, p.37 |
Floor in main hallway of new building is finished. | |
279 | The workmen Normal Eyte 5:5, p.37 |
Finished installing the vault in the new building. | |
280 | The woodwork Normal Eyte 5:5, p.37 |
Being installed in the new building. | |
281 | A suggestion Normal Eyte 5:4, p.30 |
Some students think that the new building should be named Seerley Hall. | |
282 | All will be glad to learn Normal Eyte 5:3, p.21 |
Woodwork and mosaic flooring in Administration Building being installed. | |
283 | The opening week of school Normal Eyte 5:1, p.1 |
Enrollment approaching one thousand; Administration Building should be ready by January 1, 1896; landscaping and drives modified on campus front lawn; steps removed from Central Hall; power plant under construction; teachers deal with crowded classrooms. | |
284 | Our readers abroad Normal Eyte 5:1, p.7 |
Plastering on lower floor of Administration Building finished; library may move to new building by end of October. | |
285 | When the old students on their return Normal Eyte 5:1, p.7 |
Exterior of new Administration Building is complete; front steps of Central Hall removed; front drive removed; all carriages must go behind building. | |
286 | Untitled Normal Eyte 4:36, p.564 |
Engraving of new building; photo. | |
287 | Five years of rapid growth Normal Eyte 4:36, p.567 |
Good look at development of College Hill after Boarding Department closed; development of housing and other improvements including Seerley Park. | |
288 | The state is pushing work Normal Eyte 4:36, p.568 |
Cartoon shows faculty working on Administration Building. | |
289 | The brick work Normal Eyte 4:34, p.540 |
First story of new building nearing completion; have had difficulty in securing lumber. | |
290 | Monday afternoon Normal Eyte 4:28, p.442 |
President Seerley and board members meet to decide on heating system for Administration Building. | |
291 | Work is being pushed Normal Eyte 4:27, p.427 |
Stone work will soon be done on Administration Building; most material is on site. | |
292 | Untitled Normal Eyte 4:22, p.345 |
Engraving of new building, later the Old Administration Building. | |
293 | We are pleased Normal Eyte 4:22, p.341 |
Detailed look at plans and progress on the new building (Old Administration); will house library, offices, recitation rooms, gymnasium, natural science department, and museum; corridor will connect the building to Gilchrist Hall. | |
294 | At the beginning of the last term Normal Eyte 4:15, p.229 |
Enrollment now 660 students plus sixty-five in the Preparatory Department and sixty-two in the Training School; looking forward to completion of Administration Building; will enrollment reach one thousand? | |
295 | Mr. Editor Normal Eyte 4:8, p.119 |
Would like to see the Board support the remodeling and furnishing of literary society rooms. | |
296 | Excavating for the new building is progressing rapidly Normal Eyte 4:5, p.75 |
Saturday activities in other buildings cancelled while water pipes were connected. | |
297 | Excavating for the new building Normal Eyte 4:4, p.57 |
Will cause detours for students; foundation expected to be finished this fall. | |
298 | The regular term reception Normal Eyte 4:1, p.12 |
Hard to find a place large enough to accommodate increased numbers of students; would like reception room in new building. | |
299 | Society halls Normal Eyte 3:30, p.233 |
Societies would like dedicated rooms in the new building; Board asks if they would accept rooms on third floor of Central Hall. | |
300 | Y. M. & Y. W. C. A. Normal Eyte 3:29, p.227 |
Meeting leaders announced; beginning to think of a new home now that a new building is in store. |