University construction draws censure
Article Summary:
Feels that construction on campus should have begun as soon as school was dismissed in May.
Subject(s):
| Type | Publication | Issue | Vol | Num | Page |
|---|---|---|---|---|---|
| Letter | Northern Iowan | 83 | 2 | 2 |