IndexUNI: Database of University Articles

Tunnels

Displaying 1 - 44 of 44
Title Date Summary
1 Secrets of underground tunnels revealed
O'Loughlin--Emily (Student--2008)
Northern Iowan 106:9, p.9
9/29/2009 Tunnels provide room for steam delivery to campus buildings. The tunnels allow easy access if repairs are needed; photo.
2 Union boasts 'five major projects'
Andresen--Kelli (Class of 2004)
Northern Iowan 100:2, p.1
9/5/2003 Prexy's, the Center for Multicultural Education, upstairs in the Union, Health Beat, and the retail shop will completed within a few months; a tunnel to Lang Hall will be in use; photo.
3 UNI fined $11,700 for safety infractions
Koppes--Kevin (Student--2002)
Northern Iowan 99:54, p.1
4/29/2003 The Iowa Division of Labor Services found that UNI was in violation of the Iowa Occupational Safety and Health Act on four separate counts.
4 Long-term building projects focus on student needs
Northern Iowa Today 86:2, p.6
7/1/2002 Review of campus construction projects; roster of contractors and architects; dates of expected completion; photo.
5 Campus tunnels repaired
Sheets--Kerry (Student--1988-1990)
Northern Iowan 86:7, p.3
9/26/1989 Duane Anders talks about campus utility tunnels.
6 Union addition on schedule; tunnels to be completed soon
Schooley--Terry
Northern Iowan 84:11, p.1
10/2/1987 Scheduled to be completed in fall 1988; new utility tunnels to be built; description of facilities.
7 Underground passageways a possibility
Rausch--Chris
Northern Iowan 83:30, p.6
1/20/1987 Officials talk about tunnel system that houses utilities; now off-limits to students.
8 Pipeline detour
Klunenberg--Jeff
Northern Iowan 74:34, p.1
1/31/1978 Students are deterred from walking the usual way to class, due to a large trench dug for a new steam line to the Home Management House and the EMCEC; photo.
9 Steamline breaks
Northern Iowan 73:46, p.1
3/25/1977 Steam rising from a broken steam pipe outside of the Science building; photo.
10 Students once used tunnels; in bad weather . . .
Drewelow--S. David
Northern Iowan 72:47, p.4
3/30/1976 A good look at the remaining tunnel system on campus; photo.
11 Regents approve $424,000 to renovate Sabin Hall
Northern Iowan 64:29, p.1
2/2/1968 Also appropriate money for steam tunnels and wells for air conditioning.
12 'Library construction on schedule,' Mr. Rod
College Eye 57:14, p.3
1/11/1963 Old heating tunnel removed and new tunnel built; lower level almost completely enclosed; will enable work to continue even during bad weather; photo.
13 Pickets and work stoppages on new library called off
College Eye 57:11, p.8
11/30/1962 High pressure pipe installed; will lower tunnel sections and work as long as weather permits.
14 Strike may delay library construction
College Eye 57:10, p.1
11/16/1962 Work has been stopped several times; need to get steam tunnels hooked up soon or work may be halted until spring.
15 TC campus seems cluttered with much mole-like activity
Fisher--Phyllis (Class of 1958)
College Eye 49:5, p.8
10/11/1957 Construction under way on tunnels and on drainage tiles around Wright Hall and the Women's Gymnasium.
16 Building activity renews with coming of spring
Alumnus 41:2, p.6
5/1/1957 Tunnel between Old Administration and Seerley demolished; parking lot fence near Old Campus School taken down; Lab School fieldhouse should be ready by fall; photo.
17 Grave for the College Eye?
College Eye 48:24, p.6
4/5/1957 Workers dig up the old tunnel between the library and the Administration building; photo.
18 Max says: tunnel residing is quiet, warm
College Eye 45:32, p.2
5/28/1954 Claims that he has moved into the tunnels near Campbell Hall because they are more comfortable than the dorms.
19 Special To: The Daily Record
Public Relations News Release 1951:282, p.1
12/29/1951 The new year finds the college 75 years young, looking forward to the inquguration of its graduate program in the summer of 1952. A major curriculum revision for degree students began during the 1951 summer session.
20 Our own Grand Canyon
College Eye 43:7, p.8
11/2/1951 Two student walk along the construction site outside Lawther Hall.
21 Contracts for a tunnel construction job will not be let until August 4
Public Relations News Release 1950:426, p.1
7/23/1951 Business Manager Philip C. Jennings said the proposed 840-foot tunnel will house heating pipes from the heating plant to the new women's residence hall. Six bids will be considered said Jennings.
22 State approves appropriation bill
College Eye 40:29, p.3
5/6/1949 Capital improvements included.
23 Tunnel to industrial arts building extends college heating service
Stillman--Verona (Student--1948)
College Eye 39:42, p.3
8/13/1948 Description of the campus tunnel system, which has just been extended to the new Arts and Industries Building.
24 Tunnel city lies hidden under campus
College Eye 38:32, p.5
5/16/1947 Description of the purposes and locations of the campus tunnels.
25 'Watch us as we climb to fame and glory; we are here for victory'
College Eye 34:1, p.1
9/9/1942 Quick survey of campus buildings; photo.
26 One mile of college tunnels might serve as blitzkrieg protection
College Eye 32:11, p.5
11/22/1940 A look at the campus tunnel system.
27 What do you know about your campus?
College Eye 31:3, p.4
9/29/1939 Quick facts about the ISTC campus.
28 Tunnels beneath the campus
College Eye 29:39, p.3
7/8/1938 Reporter takes tour of tunnels.
29 Tunnels beneath campus walks prove to be hot
College Eye 29:5, p.8
10/8/1937 Temperature in tunnels can reach over one hundred degrees.
30 Pool tunnel is near completion
College Eye 28:38, p.1
6/25/1937 Utility tunnel to new pool under construction.
31 Adventure and mystery await you on the streets under the ground
College Eye 28:26, p.2
4/2/1937 A walk through the campus tunnel system.
32 Tunnel on campus is being repaired
College Eye 27:7, p.4
7/10/1936 Between Campanile and Nursery School Building.
33 Just follow the little steps down below, below and come out here; tunnels, campus catacombs comprise intricate network
College Eye 27:4, p.4
6/19/1936 Description of the campus tunnel system.
34 'True Confessions', by a reporter in quest of features; patch over eye a reminder of underground journey
College Eye 24:26, p.4
3/31/1933 Student reporter injured while attempting to research an article on the campus tunnel system.
35 Power plant tunnels are nearly completed
College Eye 24:2, p.6
9/16/1932 Tunnels should be completed in about two weeks; power should be available in about a month; old plant will not be razed until spring.
36 Steam distributor will be installed
College Eye 23:50, p.4
7/15/1932 Large pit excavated for connections to campus steam tunnels.
37 The new smoke stack
Public Relations News Release 1931:128, p.1
11/30/1931 Construction of the power plant smoke stack completed by Rust Engineering; steel work on power plant building nearing completion; shops building still needs roof; steam tunnel to center of campus under construction.
38 Mysteries of tunnels beneath campus chill inquisitive reporter
College Eye 23:12, p.6
9/8/1931 Reporter describes trip through some of the 1790 feet of tunnels on campus.
39 Mr. J. E. Robinson tells of campus improvements
College Eye 19:35, p.7
5/16/1928 Recounts many repairs and upgrades during his time here.
40 College Eye staff-elect
Old Gold 0:0, p.282
6/1/1921 Humorous suggestions on improving the college; photo.
41 Untitled
Ceperley--William A. (Student--1909)
Old Gold 0:0, p.291
6/1/1912 Cartoon about life at ISTC.
42 Senior party; Halloween party is given by Class of 1910; Gymnasium is scene of merriment.
Normal Eyte 20:9, p.154
11/3/1909 Proceed via tunnel from Auditorium to Gymnasium; all wear masks and costumes; enjoy program.
43 Library Building is being enclosed; roofers are at work.
Normal Eyte 20:8, p.139
10/27/1909 Hope to enclose building before cold weather sets in; cornices being built in place; steam tunnel nearly complete.
44 Senior Halloween party
Old Gold 0:0, p.100
6/1/1908 Activities of the senior Halloween party recounted.

Questions about this service?

Contact Jaycie Vos, University Archivist
jaycie.vos@uni.edu | (319) 273-6307

 

1227 W 27th Street
Cedar Falls, Iowa 50614
(319) 273-2838  | LibAskUs@uni.edu