Tunnels
Displaying 1 - 44 of 44
Title | Date | Summary | ||
---|---|---|---|---|
1 |
Secrets of underground tunnels revealed O'Loughlin--Emily (Student--2008) Northern Iowan 106:9, p.9 |
9/29/2009 | Tunnels provide room for steam delivery to campus buildings. The tunnels allow easy access if repairs are needed; photo. | |
2 |
Union boasts 'five major projects' Andresen--Kelli (Class of 2004) Northern Iowan 100:2, p.1 |
9/5/2003 | Prexy's, the Center for Multicultural Education, upstairs in the Union, Health Beat, and the retail shop will completed within a few months; a tunnel to Lang Hall will be in use; photo. | |
3 |
UNI fined $11,700 for safety infractions Koppes--Kevin (Student--2002) Northern Iowan 99:54, p.1 |
4/29/2003 | The Iowa Division of Labor Services found that UNI was in violation of the Iowa Occupational Safety and Health Act on four separate counts. | |
4 |
Long-term building projects focus on student needs Northern Iowa Today 86:2, p.6 |
7/1/2002 | Review of campus construction projects; roster of contractors and architects; dates of expected completion; photo. | |
5 |
Campus tunnels repaired Sheets--Kerry (Student--1988-1990) Northern Iowan 86:7, p.3 |
9/26/1989 | Duane Anders talks about campus utility tunnels. | |
6 |
Union addition on schedule; tunnels to be completed soon Schooley--Terry Northern Iowan 84:11, p.1 |
10/2/1987 | Scheduled to be completed in fall 1988; new utility tunnels to be built; description of facilities. | |
7 |
Underground passageways a possibility Rausch--Chris Northern Iowan 83:30, p.6 |
1/20/1987 | Officials talk about tunnel system that houses utilities; now off-limits to students. | |
8 |
Pipeline detour Klunenberg--Jeff Northern Iowan 74:34, p.1 |
1/31/1978 | Students are deterred from walking the usual way to class, due to a large trench dug for a new steam line to the Home Management House and the EMCEC; photo. | |
9 |
Steamline breaks Northern Iowan 73:46, p.1 |
3/25/1977 | Steam rising from a broken steam pipe outside of the Science building; photo. | |
10 |
Students once used tunnels; in bad weather . . . Drewelow--S. David Northern Iowan 72:47, p.4 |
3/30/1976 | A good look at the remaining tunnel system on campus; photo. | |
11 |
Regents approve $424,000 to renovate Sabin Hall Northern Iowan 64:29, p.1 |
2/2/1968 | Also appropriate money for steam tunnels and wells for air conditioning. | |
12 |
'Library construction on schedule,' Mr. Rod College Eye 57:14, p.3 |
1/11/1963 | Old heating tunnel removed and new tunnel built; lower level almost completely enclosed; will enable work to continue even during bad weather; photo. | |
13 |
Pickets and work stoppages on new library called off College Eye 57:11, p.8 |
11/30/1962 | High pressure pipe installed; will lower tunnel sections and work as long as weather permits. | |
14 |
Strike may delay library construction College Eye 57:10, p.1 |
11/16/1962 | Work has been stopped several times; need to get steam tunnels hooked up soon or work may be halted until spring. | |
15 |
TC campus seems cluttered with much mole-like activity Fisher--Phyllis (Class of 1958) College Eye 49:5, p.8 |
10/11/1957 | Construction under way on tunnels and on drainage tiles around Wright Hall and the Women's Gymnasium. | |
16 |
Building activity renews with coming of spring Alumnus 41:2, p.6 |
5/1/1957 | Tunnel between Old Administration and Seerley demolished; parking lot fence near Old Campus School taken down; Lab School fieldhouse should be ready by fall; photo. | |
17 |
Grave for the College Eye? College Eye 48:24, p.6 |
4/5/1957 | Workers dig up the old tunnel between the library and the Administration building; photo. | |
18 |
Max says: tunnel residing is quiet, warm College Eye 45:32, p.2 |
5/28/1954 | Claims that he has moved into the tunnels near Campbell Hall because they are more comfortable than the dorms. | |
19 |
Special To: The Daily Record Public Relations News Release 1951:282, p.1 |
12/29/1951 | The new year finds the college 75 years young, looking forward to the inquguration of its graduate program in the summer of 1952. A major curriculum revision for degree students began during the 1951 summer session. | |
20 |
Our own Grand Canyon College Eye 43:7, p.8 |
11/2/1951 | Two student walk along the construction site outside Lawther Hall. | |
21 |
Contracts for a tunnel construction job will not be let until August 4 Public Relations News Release 1950:426, p.1 |
7/23/1951 | Business Manager Philip C. Jennings said the proposed 840-foot tunnel will house heating pipes from the heating plant to the new women's residence hall. Six bids will be considered said Jennings. | |
22 |
State approves appropriation bill College Eye 40:29, p.3 |
5/6/1949 | Capital improvements included. | |
23 |
Tunnel to industrial arts building extends college heating service Stillman--Verona (Student--1948) College Eye 39:42, p.3 |
8/13/1948 | Description of the campus tunnel system, which has just been extended to the new Arts and Industries Building. | |
24 |
Tunnel city lies hidden under campus College Eye 38:32, p.5 |
5/16/1947 | Description of the purposes and locations of the campus tunnels. | |
25 |
'Watch us as we climb to fame and glory; we are here for victory' College Eye 34:1, p.1 |
9/9/1942 | Quick survey of campus buildings; photo. | |
26 |
One mile of college tunnels might serve as blitzkrieg protection College Eye 32:11, p.5 |
11/22/1940 | A look at the campus tunnel system. | |
27 |
What do you know about your campus? College Eye 31:3, p.4 |
9/29/1939 | Quick facts about the ISTC campus. | |
28 |
Tunnels beneath the campus College Eye 29:39, p.3 |
7/8/1938 | Reporter takes tour of tunnels. | |
29 |
Tunnels beneath campus walks prove to be hot College Eye 29:5, p.8 |
10/8/1937 | Temperature in tunnels can reach over one hundred degrees. | |
30 |
Pool tunnel is near completion College Eye 28:38, p.1 |
6/25/1937 | Utility tunnel to new pool under construction. | |
31 |
Adventure and mystery await you on the streets under the ground College Eye 28:26, p.2 |
4/2/1937 | A walk through the campus tunnel system. | |
32 |
Tunnel on campus is being repaired College Eye 27:7, p.4 |
7/10/1936 | Between Campanile and Nursery School Building. | |
33 |
Just follow the little steps down below, below and come out here; tunnels, campus catacombs comprise intricate network College Eye 27:4, p.4 |
6/19/1936 | Description of the campus tunnel system. | |
34 |
'True Confessions', by a reporter in quest of features; patch over eye a reminder of underground journey College Eye 24:26, p.4 |
3/31/1933 | Student reporter injured while attempting to research an article on the campus tunnel system. | |
35 |
Power plant tunnels are nearly completed College Eye 24:2, p.6 |
9/16/1932 | Tunnels should be completed in about two weeks; power should be available in about a month; old plant will not be razed until spring. | |
36 |
Steam distributor will be installed College Eye 23:50, p.4 |
7/15/1932 | Large pit excavated for connections to campus steam tunnels. | |
37 |
The new smoke stack Public Relations News Release 1931:128, p.1 |
11/30/1931 | Construction of the power plant smoke stack completed by Rust Engineering; steel work on power plant building nearing completion; shops building still needs roof; steam tunnel to center of campus under construction. | |
38 |
Mysteries of tunnels beneath campus chill inquisitive reporter College Eye 23:12, p.6 |
9/8/1931 | Reporter describes trip through some of the 1790 feet of tunnels on campus. | |
39 |
Mr. J. E. Robinson tells of campus improvements College Eye 19:35, p.7 |
5/16/1928 | Recounts many repairs and upgrades during his time here. | |
40 |
College Eye staff-elect Old Gold 0:0, p.282 |
6/1/1921 | Humorous suggestions on improving the college; photo. | |
41 |
Untitled Ceperley--William A. (Student--1909) Old Gold 0:0, p.291 |
6/1/1912 | Cartoon about life at ISTC. | |
42 |
Senior party; Halloween party is given by Class of 1910; Gymnasium is scene of merriment. Normal Eyte 20:9, p.154 |
11/3/1909 | Proceed via tunnel from Auditorium to Gymnasium; all wear masks and costumes; enjoy program. | |
43 |
Library Building is being enclosed; roofers are at work. Normal Eyte 20:8, p.139 |
10/27/1909 | Hope to enclose building before cold weather sets in; cornices being built in place; steam tunnel nearly complete. | |
44 |
Senior Halloween party Old Gold 0:0, p.100 |
6/1/1908 | Activities of the senior Halloween party recounted. |
Questions about this service?
Contact Jaycie Vos, University Archivist
jaycie.vos@uni.edu | (319) 273-6307
1227 W 27th Street
Cedar Falls, Iowa 50614
(319) 273-2838 | LibAskUs@uni.edu