Tunnels

Displaying 1 - 44 of 44 in reverse chronological order
# Title Date Summary
1 Secrets of underground tunnels revealed
Northern Iowan 106:9, p.9
Tunnels provide room for steam delivery to campus buildings. The tunnels allow easy access if repairs are needed; photo.
2 Union boasts 'five major projects'
Northern Iowan 100:2, p.1
Prexy's, the Center for Multicultural Education, upstairs in the Union, Health Beat, and the retail shop will completed within a few months; a tunnel to Lang Hall will be in use; photo.
3 UNI fined $11,700 for safety infractions
Northern Iowan 99:54, p.1
The Iowa Division of Labor Services found that UNI was in violation of the Iowa Occupational Safety and Health Act on four separate counts.
4 Long-term building projects focus on student needs
Northern Iowa Today 86:2, p.6
Review of campus construction projects; roster of contractors and architects; dates of expected completion; photo.
5 Campus tunnels repaired
Northern Iowan 86:7, p.3
Duane Anders talks about campus utility tunnels.
6 Union addition on schedule; tunnels to be completed soon
Northern Iowan 84:11, p.1
Scheduled to be completed in fall 1988; new utility tunnels to be built; description of facilities.
7 Underground passageways a possibility
Northern Iowan 83:30, p.6
Officials talk about tunnel system that houses utilities; now off-limits to students.
8 Pipeline detour
Northern Iowan 74:34, p.1
Students are deterred from walking the usual way to class, due to a large trench dug for a new steam line to the Home Management House and the EMCEC; photo.
9 Steamline breaks
Northern Iowan 73:46, p.1
Steam rising from a broken steam pipe outside of the Science building; photo.
10 Students once used tunnels; in bad weather . . .
Northern Iowan 72:47, p.4
A good look at the remaining tunnel system on campus; photo.
11 Regents approve $424,000 to renovate Sabin Hall
Northern Iowan 64:29, p.1
Also appropriate money for steam tunnels and wells for air conditioning.
12 'Library construction on schedule,' Mr. Rod
College Eye 57:14, p.3
Old heating tunnel removed and new tunnel built; lower level almost completely enclosed; will enable work to continue even during bad weather; photo.
13 Pickets and work stoppages on new library called off
College Eye 57:11, p.8
High pressure pipe installed; will lower tunnel sections and work as long as weather permits.
14 Strike may delay library construction
College Eye 57:10, p.1
Work has been stopped several times; need to get steam tunnels hooked up soon or work may be halted until spring.
15 TC campus seems cluttered with much mole-like activity
College Eye 49:5, p.8
Construction under way on tunnels and on drainage tiles around Wright Hall and the Women's Gymnasium.
16 Building activity renews with coming of spring
Alumnus 41:2, p.6
Tunnel between Old Administration and Seerley demolished; parking lot fence near Old Campus School taken down; Lab School fieldhouse should be ready by fall; photo.
17 Grave for the College Eye?
College Eye 48:24, p.6
Workers dig up the old tunnel between the library and the Administration building; photo.
18 Max says: tunnel residing is quiet, warm
College Eye 45:32, p.2
Claims that he has moved into the tunnels near Campbell Hall because they are more comfortable than the dorms.
19 Special To: The Daily Record
Public Relations News Release 1951:282, p.1
The new year finds the college 75 years young, looking forward to the inquguration of its graduate program in the summer of 1952. A major curriculum revision for degree students began during the 1951 summer session.
20 Our own Grand Canyon
College Eye 43:7, p.8
Two student walk along the construction site outside Lawther Hall.
21 Contracts for a tunnel construction job will not be let until August 4
Public Relations News Release 1950:426, p.1
Business Manager Philip C. Jennings said the proposed 840-foot tunnel will house heating pipes from the heating plant to the new women's residence hall. Six bids will be considered said Jennings.
22 State approves appropriation bill
College Eye 40:29, p.3
Capital improvements included.
23 Tunnel to industrial arts building extends college heating service
College Eye 39:42, p.3
Description of the campus tunnel system, which has just been extended to the new Arts and Industries Building.
24 Tunnel city lies hidden under campus
College Eye 38:32, p.5
Description of the purposes and locations of the campus tunnels.
25 'Watch us as we climb to fame and glory; we are here for victory'
College Eye 34:1, p.1
Quick survey of campus buildings; photo.
26 One mile of college tunnels might serve as blitzkrieg protection
College Eye 32:11, p.5
A look at the campus tunnel system.
27 What do you know about your campus?
College Eye 31:3, p.4
Quick facts about the ISTC campus.
28 Tunnels beneath the campus
College Eye 29:39, p.3
Reporter takes tour of tunnels.
29 Tunnels beneath campus walks prove to be hot
College Eye 29:5, p.8
Temperature in tunnels can reach over one hundred degrees.
30 Pool tunnel is near completion
College Eye 28:38, p.1
Utility tunnel to new pool under construction.
31 Adventure and mystery await you on the streets under the ground
College Eye 28:26, p.2
A walk through the campus tunnel system.
32 Tunnel on campus is being repaired
College Eye 27:7, p.4
Between Campanile and Nursery School Building.
33 Just follow the little steps down below, below and come out here; tunnels, campus catacombs comprise intricate network
College Eye 27:4, p.4
Description of the campus tunnel system.
34 'True Confessions', by a reporter in quest of features; patch over eye a reminder of underground journey
College Eye 24:26, p.4
Student reporter injured while attempting to research an article on the campus tunnel system.
35 Power plant tunnels are nearly completed
College Eye 24:2, p.6
Tunnels should be completed in about two weeks; power should be available in about a month; old plant will not be razed until spring.
36 Steam distributor will be installed
College Eye 23:50, p.4
Large pit excavated for connections to campus steam tunnels.
37 The new smoke stack
Public Relations News Release 1931:128, p.1
Construction of the power plant smoke stack completed by Rust Engineering; steel work on power plant building nearing completion; shops building still needs roof; steam tunnel to center of campus under construction.
38 Mysteries of tunnels beneath campus chill inquisitive reporter
College Eye 23:12, p.6
Reporter describes trip through some of the 1790 feet of tunnels on campus.
39 Mr. J. E. Robinson tells of campus improvements
College Eye 19:35, p.7
Recounts many repairs and upgrades during his time here.
40 College Eye staff-elect
Old Gold 0:0, p.282
Humorous suggestions on improving the college; photo.
41 Untitled
Old Gold 0:0, p.291
Cartoon about life at ISTC.
42 Senior party; Halloween party is given by Class of 1910; Gymnasium is scene of merriment.
Normal Eyte 20:9, p.154
Proceed via tunnel from Auditorium to Gymnasium; all wear masks and costumes; enjoy program.
43 Library Building is being enclosed; roofers are at work.
Normal Eyte 20:8, p.139
Hope to enclose building before cold weather sets in; cornices being built in place; steam tunnel nearly complete.
44 Senior Halloween party
Old Gold 0:0, p.100
Activities of the senior Halloween party recounted.