Tunnels
Displaying 1 - 44 of 44 in reverse chronological order
# | Title | Date | Summary |
---|---|---|---|
1 | Secrets of underground tunnels revealed Northern Iowan 106:9, p.9 |
Tunnels provide room for steam delivery to campus buildings. The tunnels allow easy access if repairs are needed; photo. | |
2 | Union boasts 'five major projects' Northern Iowan 100:2, p.1 |
Prexy's, the Center for Multicultural Education, upstairs in the Union, Health Beat, and the retail shop will completed within a few months; a tunnel to Lang Hall will be in use; photo. | |
3 | UNI fined $11,700 for safety infractions Northern Iowan 99:54, p.1 |
The Iowa Division of Labor Services found that UNI was in violation of the Iowa Occupational Safety and Health Act on four separate counts. | |
4 | Long-term building projects focus on student needs Northern Iowa Today 86:2, p.6 |
Review of campus construction projects; roster of contractors and architects; dates of expected completion; photo. | |
5 | Campus tunnels repaired Northern Iowan 86:7, p.3 |
Duane Anders talks about campus utility tunnels. | |
6 | Union addition on schedule; tunnels to be completed soon Northern Iowan 84:11, p.1 |
Scheduled to be completed in fall 1988; new utility tunnels to be built; description of facilities. | |
7 | Underground passageways a possibility Northern Iowan 83:30, p.6 |
Officials talk about tunnel system that houses utilities; now off-limits to students. | |
8 | Pipeline detour Northern Iowan 74:34, p.1 |
Students are deterred from walking the usual way to class, due to a large trench dug for a new steam line to the Home Management House and the EMCEC; photo. | |
9 | Steamline breaks Northern Iowan 73:46, p.1 |
Steam rising from a broken steam pipe outside of the Science building; photo. | |
10 | Students once used tunnels; in bad weather . . . Northern Iowan 72:47, p.4 |
A good look at the remaining tunnel system on campus; photo. | |
11 | Regents approve $424,000 to renovate Sabin Hall Northern Iowan 64:29, p.1 |
Also appropriate money for steam tunnels and wells for air conditioning. | |
12 | 'Library construction on schedule,' Mr. Rod College Eye 57:14, p.3 |
Old heating tunnel removed and new tunnel built; lower level almost completely enclosed; will enable work to continue even during bad weather; photo. | |
13 | Pickets and work stoppages on new library called off College Eye 57:11, p.8 |
High pressure pipe installed; will lower tunnel sections and work as long as weather permits. | |
14 | Strike may delay library construction College Eye 57:10, p.1 |
Work has been stopped several times; need to get steam tunnels hooked up soon or work may be halted until spring. | |
15 | TC campus seems cluttered with much mole-like activity College Eye 49:5, p.8 |
Construction under way on tunnels and on drainage tiles around Wright Hall and the Women's Gymnasium. | |
16 | Building activity renews with coming of spring Alumnus 41:2, p.6 |
Tunnel between Old Administration and Seerley demolished; parking lot fence near Old Campus School taken down; Lab School fieldhouse should be ready by fall; photo. | |
17 | Grave for the College Eye? College Eye 48:24, p.6 |
Workers dig up the old tunnel between the library and the Administration building; photo. | |
18 | Max says: tunnel residing is quiet, warm College Eye 45:32, p.2 |
Claims that he has moved into the tunnels near Campbell Hall because they are more comfortable than the dorms. | |
19 | Special To: The Daily Record Public Relations News Release 1951:282, p.1 |
The new year finds the college 75 years young, looking forward to the inquguration of its graduate program in the summer of 1952. A major curriculum revision for degree students began during the 1951 summer session. | |
20 | Our own Grand Canyon College Eye 43:7, p.8 |
Two student walk along the construction site outside Lawther Hall. | |
21 | Contracts for a tunnel construction job will not be let until August 4 Public Relations News Release 1950:426, p.1 |
Business Manager Philip C. Jennings said the proposed 840-foot tunnel will house heating pipes from the heating plant to the new women's residence hall. Six bids will be considered said Jennings. | |
22 | State approves appropriation bill College Eye 40:29, p.3 |
Capital improvements included. | |
23 | Tunnel to industrial arts building extends college heating service College Eye 39:42, p.3 |
Description of the campus tunnel system, which has just been extended to the new Arts and Industries Building. | |
24 | Tunnel city lies hidden under campus College Eye 38:32, p.5 |
Description of the purposes and locations of the campus tunnels. | |
25 | 'Watch us as we climb to fame and glory; we are here for victory' College Eye 34:1, p.1 |
Quick survey of campus buildings; photo. | |
26 | One mile of college tunnels might serve as blitzkrieg protection College Eye 32:11, p.5 |
A look at the campus tunnel system. | |
27 | What do you know about your campus? College Eye 31:3, p.4 |
Quick facts about the ISTC campus. | |
28 | Tunnels beneath the campus College Eye 29:39, p.3 |
Reporter takes tour of tunnels. | |
29 | Tunnels beneath campus walks prove to be hot College Eye 29:5, p.8 |
Temperature in tunnels can reach over one hundred degrees. | |
30 | Pool tunnel is near completion College Eye 28:38, p.1 |
Utility tunnel to new pool under construction. | |
31 | Adventure and mystery await you on the streets under the ground College Eye 28:26, p.2 |
A walk through the campus tunnel system. | |
32 | Tunnel on campus is being repaired College Eye 27:7, p.4 |
Between Campanile and Nursery School Building. | |
33 | Just follow the little steps down below, below and come out here; tunnels, campus catacombs comprise intricate network College Eye 27:4, p.4 |
Description of the campus tunnel system. | |
34 | 'True Confessions', by a reporter in quest of features; patch over eye a reminder of underground journey College Eye 24:26, p.4 |
Student reporter injured while attempting to research an article on the campus tunnel system. | |
35 | Power plant tunnels are nearly completed College Eye 24:2, p.6 |
Tunnels should be completed in about two weeks; power should be available in about a month; old plant will not be razed until spring. | |
36 | Steam distributor will be installed College Eye 23:50, p.4 |
Large pit excavated for connections to campus steam tunnels. | |
37 | The new smoke stack Public Relations News Release 1931:128, p.1 |
Construction of the power plant smoke stack completed by Rust Engineering; steel work on power plant building nearing completion; shops building still needs roof; steam tunnel to center of campus under construction. | |
38 | Mysteries of tunnels beneath campus chill inquisitive reporter College Eye 23:12, p.6 |
Reporter describes trip through some of the 1790 feet of tunnels on campus. | |
39 | Mr. J. E. Robinson tells of campus improvements College Eye 19:35, p.7 |
Recounts many repairs and upgrades during his time here. | |
40 | College Eye staff-elect Old Gold 0:0, p.282 |
Humorous suggestions on improving the college; photo. | |
41 | Untitled Old Gold 0:0, p.291 |
Cartoon about life at ISTC. | |
42 | Senior party; Halloween party is given by Class of 1910; Gymnasium is scene of merriment. Normal Eyte 20:9, p.154 |
Proceed via tunnel from Auditorium to Gymnasium; all wear masks and costumes; enjoy program. | |
43 | Library Building is being enclosed; roofers are at work. Normal Eyte 20:8, p.139 |
Hope to enclose building before cold weather sets in; cornices being built in place; steam tunnel nearly complete. | |
44 | Senior Halloween party Old Gold 0:0, p.100 |
Activities of the senior Halloween party recounted. |