Cole--Eldon E. (Buildings and Grounds Staff)
Displaying 101 - 124 of 124 in reverse chronological order
# | Title | Date | Summary |
---|---|---|---|
101 | Weather retards work on Commons College Eye 24:19, p.4 |
Work suspended until weather improves; brick work underway; target completion date is late July 1933. | |
102 | Editorials; wounds leave scars College Eye 24:17, p.2 |
E. E. Cole reports that cutting across the grass in winter does more harm than doing the same thing in summer. | |
103 | Burt Welty compares college life of '96 with that of today College Eye 24:12, p.1 |
Donald Barker reflects on the different activities of students now compared to when he was in college. | |
104 | Fall dances and house parties are features of week-end social events College Eye 24:8, p.3 |
Campus social calendar. | |
105 | Two Minutes College Eye 23:48, p.2 |
Criticizes students for taking short cuts through the grass. | |
106 | Juvenile co-ed sprees speedily College Eye 23:47, p.2 |
E. E. Cole's daughter has travel plans. | |
107 | Grandstands will be built this summer; football seats will more than double capacity of the stadium College Eye 23:45, p.1 |
Will also make improvements to Central Hall and put in new sidewalks. | |
108 | Officers of Administration Old Gold 0:0, p.19 |
Photos and descriptions of the officers of administration. | |
109 | Heating plant here will be finished soon; equipment installation begun, states Supt. E. E. Cole; contracts are granted for varied types of apparatus College Eye 23:33, p.1 |
Installation of technical equipment now under way; hope to be ready by October. | |
110 | The installation of equipment Public Relations News Release 1931:258, p.1 |
Work on boiler installation to begin March 1; conveyer and stoker work to begin March 15; alternating current to replace direct current; turbine flook work now under way; hope to have work compete by October 1932. | |
111 | Power plant excavations are complete; all concrete footings and foundation walls will be finished within two weeks, says construction boss College Eye 23:13, p.1 |
Building will cost $90,000; Tapager Construction is general contractor; description of the building; stack will be 197 feet tall. | |
112 | All of the concrete has been poured Public Relations News Release 1931:5, p.1 |
Concrete footings complete; foundation walls to begin soon; steel for shops building is on site; chimney construction let as separate contract. | |
113 | Cole moves to campus College Eye 23:7, p.4 |
Moves into superintendent's house after James Robinson moves out. | |
114 | Has new job College Eye 23:5, p.1 |
E. E. Cole, superintendent of buildings and grounds; photo. | |
115 | New heating plant Alumnus 15:3, p.9 |
Excavation begins on $365,000 heating plant; hope to be ready by fall 1932; shops, garage buildings, and railroad siding will also be built; building specifications. | |
116 | E. E. Cole new superintendent Alumnus 15:3, p.10 |
Appointed Superintendent of Buildings and Grounds; succeeds J. E. Robinson. | |
117 | Work on power plant will begin July 6 College Eye 23:4, p.1 |
Laying of water pipes complete; will begin excavation soon. | |
118 | Tapager Construction Company gets general heating plant contract with bid of $88,666 College Eye 23:3, p.1 |
Will house power plant, garages, and physical plant facilities; parts to be complete by January 1932; other parts will be ready in fall 1932; designed by E. E. Cole. | |
119 | Cole takes Robinson's post July 1, veteran official ends long period of service as superintendent of the buildings and grounds College Eye 23:1, p.1 |
James Robinson will supervise upkeep of campus and janitorial service; profile of E. E. Cole. | |
120 | E. E. Cole will become superintendent of building and grounds Public Relations News Release 1930:438, p.1 |
Suceeds James E. Robinson, who will supervise janitors and upkeep of college grounds; profile of E. E. Cole. | |
121 | Board of Education approves heating plant for college; new unit includes heating and power plant, shops, and garage buildings College Eye 22:32, p.1 |
$365,000 appropriated; will supply heat and power to campus; to be equipped with stoker; description of the boilers. | |
122 | One of the most familiar landmarks Public Relations News Release 1930:399, p.1 |
Construction of new Power Plant begins around July 1; lengthy description of the new plant and the shops building. | |
123 | Construction of the new $365,000 service unit Public Relations News Release 1930:397, p.1 |
Work will begin July 1 on a new power and heating plant as well as a shops and garage building; E. E. Cole is architect. | |
124 | College officials and students use new blueprint machine College Eye 22:7, p.4 |
Description of the new machine; will be used by students and E. E. Cole. |