Gymnasium

Displaying 101 - 131 of 131 in reverse chronological order
# Title Date Summary
101 The Gymnasium; "such an evident air of solidity and durability that it is really impressive"
Normal Eyte 15:13, p.196
Gymnasium; photo.
102 From drill to physical culture; military work abandoned because United States government was too exacting in demands; physical culture more popular
Normal Eyte 15:13, p.193
History of the ISNS Student Battalion; physical education will succeed military training; description of new Gymnasium facilities; photo.
103 Our new Gymnasium; the pride of the Normal School nearly finished
Normal Eyte 15:2, p.19
The new Gymnasium is finally finished; should be open in a week; includes a swimming pool, two exercise rooms, a track, and classrooms; description of the building; north portion will be for women; photo.
104 You can't even go to the new Gymnasium
Normal Eyte 15:1, p.1
In order to see the new gym, you need to be a member of the Athletic Association.
105 Our new gym; bricklayers will soon be here again
Normal Eyte 14:26, p.412
Will used glazed brick on interiors; swimming pool completion date unclear; heating and ventilation contracts let; two new boilers will be added; hope that most of the facility will be available for fall 1904.
106 Supt. J. E. Robinson
Normal Eyte 14:23, p.366
Went to Chicago on business related to the new Gymnasium.
107 Trustees meet
Normal Eyte 14:15, p.235
An appropriation for golf clubs made; Newman Club will receive a meeting room; allocations for new Gymnasium made; 3000 alumni bulletins will be printed.
108 Work on the new gymnasium
Normal Eyte 14:14, p.222
First floor is complete; windows enclosed; work on the Gymnasium will be stopped until spring.
109 Physical culture; the girls will enjoy games and apparatus work
Normal Eyte 14:12, p.187
When the new gym is finished, two years of physical work will be required for all women.
110 Official notes
Normal Eyte 14:11, p.172
Roster of those completing degrees; transition from military training to sports is going well; smokestack nearly done; Trustees select brick for Gymnasium; Alison Aitchison will replace Bertha Marsh; Professor Fitzgerald granted leave.
111 Official notes
Normal Eyte 14:4, p.51
Training department enrollment growing; Science Hall construction halted to concentrate on the Gymnasium and smokestack; heating system installed in Gymnasium; leave of absence granted to Henrietta Thornton.
112 We are growing; the Gymnasium and Laboratory are being constructed
Normal Eyte 14:1, p.13
The Gymnasium will be open by next September; description of the Gymnasium and the Laboratory Building; credit due to James Robinson.
113 Work of excavating for the new gymnasium building commenced
Normal Eyte 13:28, p.444
Began April 14; currently filling low places.
114 At the meeting of the Normal Board of Trustees
Normal Eyte 13:26, p.411
Proudfoot and Bird presented plans for the Gymnasium; accepted with some changes.
115 The building committee
Normal Eyte 13:26, p.402
Will meet to arrange excavation and foundation for Gymnasium; will also build smokestack and power plant.
116 Speech making
Normal Eyte 13:16, p.242
Getting tired of repetitious oratory.
117 New $60,000 gymnasium
Normal Eyte 13:16, p.246
Plans accepted by building committee; separate facilities for men and women; lengthy description of the building.
118 The Normal Board of Trustees
Normal Eyte 13:16, p.253
Held extra meeting to go over Gymnasium plans.
119 Official
Normal Eyte 13:15, p.225
Lengthy account of ISTA meeting; Board of Trustees will make final decisions on plans for the Gymnasium
120 The Board of Trustees
Normal Eyte 13:12, p.190
Arranging location of new Gymnasium.
121 Notes by the way
Normal Eyte 13:7, p.97
Letter from President Seerley on other schools' buildings and plans.
122 Notes on the way
Normal Eyte 13:6, p.82
Letter from President Seerley on other schools' buildings and plans.
123 Notes by the way
Normal Eyte 13:5, p.65
Letter from President Seerley on other schools' buildings and plans.
124 Notes by the way
Normal Eyte 13:4, p.50
Letter from President Seerley on other schools' gymnasium buildings and plans.
125 President Seerley
Normal Eyte 13:3, p.38
Left on trip to the East to investigate gymnasium design.
126 Board of Trustees meeting
Normal Eyte 13:2, p.18
Military drill reorganized; military and physical training work more closely associated; committee will plan for new buildings on quadrangle; President Seerley will visit Eastern schools; Superintendent Robinson will have an electrician.
127 By the action of both houses of the General Assembly
Normal Eyte 12:27, p.417
General Assembly enacts millage tax; ISNS will receive one tenth of a mill of real estate tax beginning in 1903 and continuing through 1908; will use money to erect buildings.
128 The bath room
Normal Eyte 12:19, p.301
Athletic Association will manage bathroom in the Gymnasium.
129 The new gymnasium
Normal Eyte 12:12, p.178
New gym facilities slated to open soon, but not soon enough; school needs a new gymnasium.
130 Extracts from Board of Trustees report
Normal Eyte 12:4, p.50
Report cites rising enrollment and consequent needs including a laboratory building, gymnasium, library, landscaping, and sidewalks
131 Athletic
Normal Eyte 9:33, p.791
ISNS scored no points at state field meet and will not be able to participate in further competition; blames lack of an adequate training facility and little student support.