Gymnasium
Displaying 101 - 131 of 131 in reverse chronological order
# | Title | Date | Summary |
---|---|---|---|
101 | The Gymnasium; "such an evident air of solidity and durability that it is really impressive" Normal Eyte 15:13, p.196 |
Gymnasium; photo. | |
102 | From drill to physical culture; military work abandoned because United States government was too exacting in demands; physical culture more popular Normal Eyte 15:13, p.193 |
History of the ISNS Student Battalion; physical education will succeed military training; description of new Gymnasium facilities; photo. | |
103 | Our new Gymnasium; the pride of the Normal School nearly finished Normal Eyte 15:2, p.19 |
The new Gymnasium is finally finished; should be open in a week; includes a swimming pool, two exercise rooms, a track, and classrooms; description of the building; north portion will be for women; photo. | |
104 | You can't even go to the new Gymnasium Normal Eyte 15:1, p.1 |
In order to see the new gym, you need to be a member of the Athletic Association. | |
105 | Our new gym; bricklayers will soon be here again Normal Eyte 14:26, p.412 |
Will used glazed brick on interiors; swimming pool completion date unclear; heating and ventilation contracts let; two new boilers will be added; hope that most of the facility will be available for fall 1904. | |
106 | Supt. J. E. Robinson Normal Eyte 14:23, p.366 |
Went to Chicago on business related to the new Gymnasium. | |
107 | Trustees meet Normal Eyte 14:15, p.235 |
An appropriation for golf clubs made; Newman Club will receive a meeting room; allocations for new Gymnasium made; 3000 alumni bulletins will be printed. | |
108 | Work on the new gymnasium Normal Eyte 14:14, p.222 |
First floor is complete; windows enclosed; work on the Gymnasium will be stopped until spring. | |
109 | Physical culture; the girls will enjoy games and apparatus work Normal Eyte 14:12, p.187 |
When the new gym is finished, two years of physical work will be required for all women. | |
110 | Official notes Normal Eyte 14:11, p.172 |
Roster of those completing degrees; transition from military training to sports is going well; smokestack nearly done; Trustees select brick for Gymnasium; Alison Aitchison will replace Bertha Marsh; Professor Fitzgerald granted leave. | |
111 | Official notes Normal Eyte 14:4, p.51 |
Training department enrollment growing; Science Hall construction halted to concentrate on the Gymnasium and smokestack; heating system installed in Gymnasium; leave of absence granted to Henrietta Thornton. | |
112 | We are growing; the Gymnasium and Laboratory are being constructed Normal Eyte 14:1, p.13 |
The Gymnasium will be open by next September; description of the Gymnasium and the Laboratory Building; credit due to James Robinson. | |
113 | Work of excavating for the new gymnasium building commenced Normal Eyte 13:28, p.444 |
Began April 14; currently filling low places. | |
114 | At the meeting of the Normal Board of Trustees Normal Eyte 13:26, p.411 |
Proudfoot and Bird presented plans for the Gymnasium; accepted with some changes. | |
115 | The building committee Normal Eyte 13:26, p.402 |
Will meet to arrange excavation and foundation for Gymnasium; will also build smokestack and power plant. | |
116 | Speech making Normal Eyte 13:16, p.242 |
Getting tired of repetitious oratory. | |
117 | New $60,000 gymnasium Normal Eyte 13:16, p.246 |
Plans accepted by building committee; separate facilities for men and women; lengthy description of the building. | |
118 | The Normal Board of Trustees Normal Eyte 13:16, p.253 |
Held extra meeting to go over Gymnasium plans. | |
119 | Official Normal Eyte 13:15, p.225 |
Lengthy account of ISTA meeting; Board of Trustees will make final decisions on plans for the Gymnasium | |
120 | The Board of Trustees Normal Eyte 13:12, p.190 |
Arranging location of new Gymnasium. | |
121 | Notes by the way Normal Eyte 13:7, p.97 |
Letter from President Seerley on other schools' buildings and plans. | |
122 | Notes on the way Normal Eyte 13:6, p.82 |
Letter from President Seerley on other schools' buildings and plans. | |
123 | Notes by the way Normal Eyte 13:5, p.65 |
Letter from President Seerley on other schools' buildings and plans. | |
124 | Notes by the way Normal Eyte 13:4, p.50 |
Letter from President Seerley on other schools' gymnasium buildings and plans. | |
125 | President Seerley Normal Eyte 13:3, p.38 |
Left on trip to the East to investigate gymnasium design. | |
126 | Board of Trustees meeting Normal Eyte 13:2, p.18 |
Military drill reorganized; military and physical training work more closely associated; committee will plan for new buildings on quadrangle; President Seerley will visit Eastern schools; Superintendent Robinson will have an electrician. | |
127 | By the action of both houses of the General Assembly Normal Eyte 12:27, p.417 |
General Assembly enacts millage tax; ISNS will receive one tenth of a mill of real estate tax beginning in 1903 and continuing through 1908; will use money to erect buildings. | |
128 | The bath room Normal Eyte 12:19, p.301 |
Athletic Association will manage bathroom in the Gymnasium. | |
129 | The new gymnasium Normal Eyte 12:12, p.178 |
New gym facilities slated to open soon, but not soon enough; school needs a new gymnasium. | |
130 | Extracts from Board of Trustees report Normal Eyte 12:4, p.50 |
Report cites rising enrollment and consequent needs including a laboratory building, gymnasium, library, landscaping, and sidewalks | |
131 | Athletic Normal Eyte 9:33, p.791 |
ISNS scored no points at state field meet and will not be able to participate in further competition; blames lack of an adequate training facility and little student support. |