Highways and Roads

Displaying 201 - 266 of 266
# Title Date Summary
201 Traffic division sets up signals
College Eye 42:34, p.3
In area around Campus School.
202 Three blinker traffic lights have been installed at pedestrian crossings on 27th street, the road cutting the south campus of the college
Public Relations News Release 1950:399, p.1
A spokesman for the college's traffic committee said twenty miles per hour speed limit signs would also be installed on the 27th Street approaches to the blinker lights.
203 Committee plans for guide marks
College Eye 42:9, p.7
Will attempt to assist visitors find their way around campus.
204 Notice
College Eye 41:19, p.2
Cars need to be moved from streets to parking lots to allow for removal of ice.
205 Untitled
College Eye 40:37, p.2
Encourages students not to jay-walk.
206 Untitled
College Eye 40:29, p.2
Encourages students to set an example by obeying the rules set by the Campus School safety patrol.
207 Notice
College Eye 40:28, p.6
Asks ISTC students to obey Campus School safety patrols.
208 Street gets new face
Alumnus 32:4, p.4
College Street between 20th and 21st Streets is paved, despite difficulties.
209 Completion time for new pavement on College St. set
College Eye 39:42, p.4
Hope to complete work by September 15; experience some difficulties in locating old sewer and in acquiring supplies; street from 20th Street to Seerley Boulevard will be fifteen feet wider than the old street.
210 Paving of College St. to begin next week
College Eye 39:39, p.3
Bricks will be removed to make way for concrete surface from 20th Street to Seerley Boulevard.
211 The Way I See It
College Eye 39:36, p.2
Humorous suggestion that better roads would lead to a better atmosphere for dating.
212 18 junior high boys conduct safety patrol
College Eye 39:27, p.7
Will help to direct students at highway crossings.
213 Safety . . . .
College Eye 39:26, p.2
Comments on adding safety patrols on 23rd just make it safer for pedestrians to cross.
214 Road improvement survey will be conducted on campus next week
College Eye 39:7, p.1
State road officials will talk with ISTC students.
215 It's Seerley Boulevard now
Alumnus 27:4, p.9
24th Street renamed in honor of President Seerley; change promoted by local Rotary Club; Seerley family expresses gratitude.
216 Rotarians urge naming street for Pres. Seerley
College Eye 34:38, p.1
Will present resolution to city to name 24th Street in honor of President Seerley.
217 Let's talk it over with the editor
College Eye 34:42, p.2
Comments on traveling home for the holidays, women participating in the war effort, the men who eat their lunch in the Auditorium hallway, and an old editorial by a man who refused to sacrifice his life for the war effort.
218 Some improvements made on local campus
College Eye 31:39, p.1
Install sewers and water system in stadium; paint woodwork on Women's Gym.
219 Safety, please
College Eye 29:36, p.1
Urges students to drive safely.
220 Students violate traffic rules
College Eye 29:36, p.1
Survey shows high rate of violation in College Hill area.
221 High School class undertakes city traffic survey
College Eye 29:5, p.7
At suggestion of Professor Hart.
222 Highways are happy ways
College Eye 28:38, p.2
Students from Independence tell of their adventures on their daily commute.
223 Lighting, paving among campus improvements
Alumnus 20:4, p.18
Improvements include new stadium, laundry building, greenhouse; roof repairs; gateway south of Men's Gym; paving; new outdoor lighting system; and landscaping.
224 Parking space increased
Alumnus 20:4, p.20
Add 150 spaces for total of about 500 spaces near Stadium; Hudson Road upgraded from cinders to gravel as it is designated a link between highways north and south of Cedar Falls.
225 Men's swimming pool has been much used during hot weather
College Eye 27:9, p.4
226 Seclusion leaves as highway enters
College Eye 27:38, p.1
Road west of stadium, now called Hudson Road, will be state highway.
227 New tennis courts nearing completion; plan skating rink
College Eye 27:14, p.4
Women's courts should be completed in October; will build putting green; hope to pave men's courts in several years.
228 Plan sidewalks, driveways and hockey field
College Eye 25:14, p.1
Area around Commons will be landscaped and sidewalks and drives will be constructed; parking lot north of Training School will be cleaned up and seeded.
229 Forum
College Eye 24:38, p.2
Wants pot hole filled.
230 H. L. Eells, professor of education
Public Relations News Release 1931:291, p.1
Will be on state advisory committee regarding highway safety.
231 C. S. Cory shoots six on par four first hole; tricks prove hazardous
College Eye 23:4, p.3
Encounters difficulty in getting to golf course.
232 Class wins endurance record watching traffic
College Eye 21:43, p.6
Professor Eells' class notes traffic at an intersection.
233 Grid stars do summer training on brick pile
College Eye 21:39, p.4
Two students are busy taking up the brick driveway.
234 Safety committee to eliminate traffic dangers
College Eye 21:22, p.6
For rural children.
235 T. C. will have new road by July 16
College Eye 19:41, p.1
Highway Commission putting in roads on west side of campus.
236 The condition of the roads
College Eye 18:37, p.5
Mr. Moeller's extension work slowed down due to poor roads.
237 All set for intersociety debate; Philos and Aristos to clash next Monday evening
College Eye 16:16, p.1
Will debate condition of Iowa roads.
238 Societies working hard on debate
College Eye 16:11, p.7
Will consider matter of Iowa roads.
239 College buys over 30 acres; size of campus almost doubled; possession takes place March 1st, 1924
College Eye 15:3, p.1
Purchases 31.8 acres of land west of current campus; two small tracts still under consideration; land will be used for athletic fields and a gymnasium; will support curriculum changes that now include physical education.
240 Rural Department
College Eye 11:11, p.5
Castle Hill School has new road.
241 Editorially Speaking
College Eye 11:6, p.4
Encourage men going out for football to stick with it; claims that new road between Cedar Falls and Waterloo should be extended; speaks against article concerning a College Hill church.
242 Natural Science
College Eye 11:5, p.6
News notes from the department.
243 To pave 27th street?
College Eye 10:8, p.4
As part of developing road system south of campus.
244 Appropriations
Quarterly News Letter to the Alumni 0:0, p.1
ISTC granted money for building Vocational Building and second section of women's dorm, furnishing Bartlett Hall, paving 23rd Street, organizing Study Centers in all counties, and providing a 48 week school year.
245 Official Notes
College Eye 6:28, p.3
News of alumni and General Assembly activity.
246 Untitled
College Eye 4:7, p.4

Division of funds given by the Board of Education; necessary due to expanded departments and lengthened summer session; will pave a portion of 23rd Street.

247 Untitled
Old Gold 0:0, p.230
Photo of College Street.
248 Twenty-third and Twenty-second Streets
Normal Eyte 18:2, p.20
City of Cedar Falls will pave streets that lead to campus; will pave Sixteenth Street to Clay Street and then Clay Street to Twenty-second Street.
249 The City Council of Cedar Falls
Normal Eyte 17:27, p.418
Planning to pave street from Main Street to campus.
250 Be thankful
Normal Eyte 14:12, p.177
Normal Street paving is complete.
251 Mud
Normal Eyte 14:2, p.19
Normal Street is nearly impassable from 20th to 26th Street due to paving work; shortage of paving brick has delayed project.
252 The meeting of the Board of Trustees
Normal Eyte 12:28, p.443
Decided to pave Normal Street.
253 Official
Normal Eyte 10:5, p.102
Lecture Course seats will be assigned; landscaping of northeast corner of campus will get underway; seems to be some delay in shipping stone to the Auditorium Building construction site.
254 Messrs. McDuffie and Mullin
Normal Eyte 9:1, p.6
Will meet with contractors for bridge between South and Central Halls and for drainage and grading work on Normal Street.
255 Spring's awakening
Normal Eyte 8:29, p.407
24th Street graded, sidewalks being laid, new houses being built on the Hill.
256 A new sidewalk
Normal Eyte 8:27, p.378
Being built along north drive; central drive east of buildings will be abandoned.
257 When the agent of the M. C. Lilley Company was here
Normal Eyte 8:3, p.36
Found campus beautiful; description of changes in roads and drives on and off campus; more lots will be developed on College Hill.
258 The grounds are being fixed up and the drives widened
Normal Eyte 6:29, p.344
259 When the old students on their return
Normal Eyte 5:1, p.7
Exterior of new Administration Building is complete; front steps of Central Hall removed; front drive removed; all carriages must go behind building.
260 The bridge at the foot of Normal Hill
Normal Eyte 3:27, p.215
Has already been defaced after recent painting.
261 One morning this week
Normal Eyte 2:33, p.252
After exhausting governmental avenues, President Seerley makes local appeal for private donations for bridge and sidewalk repair; result is double walk on each side of the elevated bridge.
262 The old croquet ground north of Central Hall is no more
Normal Eyte 2:6, p.46
New cinder drive installed leading from front drive to barn.
263 The progress of the work on our new street
Normal Eyte 2:4, p.34
New street to Cedar Falls will be level and not bordered by wire fences; great improvement over 12th Street route.
264 The steps toward improving the roads
Normal Eyte 1:14, p.110
Encouraged by recent efforts to improve roads between town and the Normal.
265 The Board of Directors
Normal Eyte 10:4, p.93
Roads in such bad shape that the Board had difficulty reaching town.
266 Normal boulevards have been repaired
Students' Offering 2:8, p.11

Look respectable.