Old Gilchrist Hall

Displaying 151 - 200 of 202 in reverse chronological order
# Title Date Summary
151 The school as it looked when President Seerley began his work
College Eye 1:12, p.10
Old Gilchrist Hall and Central Hall; photo.
152 Old elms--South Building
Old Gold 0:0, p.167
Photo.
153 Historical
Old Gold 0:0, p.6
History of public normal schools in Iowa; special emphasis on the early history of the Iowa State Normal School; photo.
154 East front, looking southwest
Old Gold 0:0, p.108
View of campus; photo.
155 South east view
Pedagog 0:0, p.4
View of campus from the southeast; photo.
156 The original State Normal School, 1876
Normal Eyte Annual 0:0, p.6
Brief description of Central Hall and North Hall and their use in 1905; photo.
157 Views of buildings
Normal Eyte Annual 0:0, p.9
Major buildings on campus in 1905; Superintendent James Robinson; photo.
158 The Auditorium
Normal Eyte Annual 0:0, p.66
Auditorium is a frequently used room that has a capacity of 2500 people; photo.
159 Our new gym; bricklayers will soon be here again
Normal Eyte 14:26, p.412
Will used glazed brick on interiors; swimming pool completion date unclear; heating and ventilation contracts let; two new boilers will be added; hope that most of the facility will be available for fall 1904.
160 A new picture
Normal Eyte 14:7, p.109
A new picture of President Roosevelt has been added to Gilchrist Hall.
161 The main chapel assembly
Normal Eyte 12:12, p.187
Will now be held in the new Auditorium, not Old Gilchrist Hall.
162 The third story of the corridor
Normal Eyte 9:3, p.61
Now completed.
163 Messrs. McDuffie and Mullin
Normal Eyte 9:1, p.6
Will meet with contractors for bridge between South and Central Halls and for drainage and grading work on Normal Street.
164 Expressions of disgust
Normal Eyte 8:17, p.239
Heating system in Gilchrist Hall fails.
165 Among the improvements
Normal Eyte 8:4, p.56
Electric lights installed in chapel.
166 The Board of Trustees
Normal Eyte 7:36, p.6
News of recent action including electricity for the chapel, new musical organizations, and contracts with the local school district.
167 State Normal buildings and grounds
Normal Eyte 7:35, p.
Panoramic view from the east; photo.
168 The wide hall connecting the new building and South Hall
Normal Eyte 7:6, p.69
Pictures displayed there.
169 State Normal buildings
Normal Eyte 6:33, p.386
Panoramic view from the east; photo.
170 The two windows on the north side of the chapel
Normal Eyte 6:24, p.284
Replaced by clear glass.
171 All the floors on the third floor of old Central Hall
Normal Eyte 6:2, p.15
Have been renewed; walls and ceiling of Gilchrist Hall have been improved; school still needs more room.
172 Iowa State Normal, Cedar Falls, Iowa
Normal Eyte 5:31, p.297
The ISNS buildings from the east; photo.
173 Board meeting items
Normal Eyte 5:29, p.268
Board elects faculty and arranges them into departments; new laboratories established; museum will get new cases; C. P. Colegrove will take over President Seerley's classes.
174 The new central building
Normal Eyte 5:11, p.81
President Seerley gives a lengthy description of the new building, including construction materials and floor plans; two story corridor or bridge connects it with Gilchrist Hall; first and second floors are ready for use; third floor ready in September.
175 We are pleased
Normal Eyte 4:22, p.341
Detailed look at plans and progress on the new building (Old Administration); will house library, offices, recitation rooms, gymnasium, natural science department, and museum; corridor will connect the building to Gilchrist Hall.
176 The Fourth Years
Normal Eyte 4:15, p.235
Now seated on rostrum because of crowded conditions.
177 One need not jump down
Normal Eyte 4:10, p.156
New steps installed in chapel.
178 Untitled
Normal Eyte 3:36, p.282
Panoramic view of campus looking east; photo.
179 The new bridge
Normal Eyte 2:10, p.79
Will connect Old Gilchrist and Central Halls; under construction; students will appreciate the shelter from wind and rain.
180 A senior left his books in South Hall
Normal Eyte 2:8, p.65
Finds Old Gilchrist doors open, despite strict rules about Central Hall doors.
181 A large mass of plaster
Normal Eyte 2:5, p.37
Fell from ceiling of first floor in South Hall.
182 Occasionally we are befriended with contributions
Normal Eyte 2:4, p.27
Urges students to use drop box for Normal Eyte contributions only and not for mail or other material.
183 At the meeting of the Board of Directors
Normal Eyte 1:12, p.94
Boarding Department will be discontinued and Central Hall fitted for classrooms; prep course to begin for those not ready for Normal classes; model school to start in North Hall; third level bridge may be built between Central and Old Gilchrist Halls.
184 Many of the old students have not seen
Normal Eyte 1:7, p.49
Describes improved equipment and facilities of the industrial department under the supervision of Professor Page in the basement of Old Gilchrist Hall; notes that many women students take part in the industrial course.
185 The President's Cottage
Normal Eyte 1:2, p.16
Description of facilities for the President's family; significant improvement over quarters in Old Gilchrist Hall; cost was $6000; photo.
186 The following is an exhibit
Students' Offering 8:36, p.10
Financial transactions associated with chapel fresco work.
187 The library of the ISNS
Students' Offering 8:32, p.7
Description of 1800 volume library.
188 With the close of the commencement exercises
Students' Offering 8:32, p.7
Sixteen students deliver orations.
189 The first half of the fall term
Students' Offering 8:32, p.10
New building adding to efficiency of school; $1000 in equipment added.
190 The eighth year's work
Students' Offering 8:32, p.7
New building ready for use at beginning of fall term; detailed description of facilities; Maude Gilchrist (sciences) and Ella Miller (model school) added to faculty.
191 The new chapel
Students' Offering 7:30, p.5
Complete except for seating; dedication will be June 8, 1883.
192 W. H. Houston
Students' Offering 7:29, p.6
Principal at Brush Creek.
193 The work on the new building
Students' Offering 7:29, p.5
Steam heat is on; plaster being applied; speaking tubes installed; pipes for gas lighting inserted.
194 The School Board recently
Students' Offering 7:29, p.3
With new building available, enrollment need not be limited and may accommodate four hundred students; new faculty will be added.
195 The music of the hammer
Students' Offering 7:28, p.5
Lathing is about half done in new building; prepare to put in steam pipes linked to present system.
196 The work at the Normal building
Students' Offering 7:27, p.5
Most brick work done; slates being put on roof, which should be finished by Christmas; inside work can then move ahead.
197 On Saturday morning
Students' Offering 7:26, p.5
Worker dislocated arm while working in new building; recovering well.
198 Cleland Gilchrist
Students' Offering 7:26, p.6
Had been farming near Monticello; returns to Normal to help with new building.
199 The new building
Students' Offering 7:26, p.5
Progressing well; walls completed above second story level; people drive out to see it.
200 The Class of 1882
Students' Offering 6:25, p.6
Design class badge; will place commemorative stone in new building.