Construction
Displaying 301 - 400 of 474
| # | Title | Date | Summary |
|---|---|---|---|
| 301 | The emerging new face of SCI College Eye 60:5, p.5 |
Photos showing changes that have been made on campus. | |
| 302 | Zealous coeds to walk more when residing in new hall College Eye 59:10, p.5 |
A look at construction projects proposed or underway. | |
| 303 | Library completion expected in April College Eye 58:14, p.3 |
Good weather has helped construction of new Library, Administration Building, addition to Campbell Hall, and Shull Hall. | |
| 304 | Two construction projects to be completed by Fall College Eye 57:39, p.3 |
Work continuing on Library, Campbell Hall addition, new seating in O. R. Latham Stadium, and Shull Hall; photo. | |
| 305 | Library proceeds as scheduled College Eye 57:25, p.4 |
Full crew at work again after cold weather. | |
| 306 | 'Library construction on schedule,' Mr. Rod College Eye 57:14, p.3 |
Old heating tunnel removed and new tunnel built; lower level almost completely enclosed; will enable work to continue even during bad weather; photo. | |
| 307 | Pickets and work stoppages on new library called off College Eye 57:11, p.8 |
High pressure pipe installed; will lower tunnel sections and work as long as weather permits. | |
| 308 | Strike may delay library construction College Eye 57:10, p.1 |
Work has been stopped several times; need to get steam tunnels hooked up soon or work may be halted until spring. | |
| 309 | Students, too, concerned with library work stoppage College Eye 57:10, p.2 |
Construction workers stop working because of low wages and concerns of lost time are brought up. | |
| 310 | Workers back on job Tuesday after strike College Eye 57:9, p.7 |
Construction of new library building halted briefly after plumbers picket. | |
| 311 | Excavation is really a library College Eye 57:7, p.2 |
The mess from construction is due to the construction of the new library. | |
| 312 | Legislator visits ISTC campus Public Relations News Release 1960:246, p.1 |
Representative John M. Ely, Jr. visits the Teachers College campus, where he attends the Administrative Council Luncheon and observes the construction of four new buildings. | |
| 313 | Construction is progressing College Eye 52:16, p.1 |
Work underway on Student Health Center, Music Building, Arts and Industries Building, Rider Hall, and other additions and repairs. | |
| 314 | Construction and remodeling at ISTC Public Relations News Release 1960:173, p.1 |
A music education building, men's dormitory, the Health Center, and an Arts and Industries addition are contracted. Improvements to the heating plant, remodeling of the auditorium, and a greenhouse extension are planned. | |
| 315 | Expansion program booms College Eye 52:3, p.4 |
Detailed look at proposed construction in the next few years; map. | |
| 316 | Untitled College Eye 52:3, p.3 |
Construction workers examine plans for the new health center; photo. | |
| 317 | Contracts awarded for I. S. T. C. dormitory Public Relations News Release 1960:8, p.1 |
Construction contracts are awarded for a new dormitory after the confirmation of financial arrangements by the Board of Regents. The new building will be located south of the men's gymnasium, and will support up to four-hundred students. | |
| 318 | Iowa legislators visit campus today to view construction College Eye 51:38, p.1 |
||
| 319 | Legislature appropriates $2,572,250; substantial start on building program Alumnus 44:2, p.2 |
New buildings will include a health services facility and a music building; an addition to Arts and Industries; improvements to infrastructure; new dorm also approved; photo. | |
| 320 | Six classrooms updated in campus improvement jobs Alumnus 44:1, p.12 |
Significant improvements in infrastructure include increased water pressure, electricity upgrades, paving, removal of coal train railroad tracks, and athletic facilities near new Campus School. | |
| 321 | TC campus seems cluttered with much mole-like activity College Eye 49:5, p.8 |
Construction under way on tunnels and on drainage tiles around Wright Hall and the Women's Gymnasium. | |
| 322 | Iowa lags in college building program College Eye 49:1, p.1 |
President Maucker shows that Iowa colleges need new buildings. | |
| 323 | No funds--no building at TC; veto postpones TC plans for campus construction College Eye 49:1, p.1 |
Governor Loveless vetoes appropriations bill; President Maucker hopes for special session; photo. | |
| 324 | Leading It Out College Eye 46:37, p.2 |
Construction on campus, re-naming of State Board of Education, and Bermuda shorts leave Ricki Ridali with little left to write about. | |
| 325 | Untitled College Eye 43:37, p.2 |
Discouraged by the need for a separate outhouse for construction workers on campus; asks for equality. | |
| 326 | Special To: the Waterloo Courier Public Relations News Release 1951:307, p.1 |
North Hall, new girls' dormitory, should be completed in the spring of 1952. Construction started in the spring of 1950. Total Cost: $915,000. | |
| 327 | Special to: The Waterloo Courier Public Relations News Release 1951:192, p.1 |
Construction on the elementary wing of the new campus laboratory, which began in the summer of 1951, school should be approximately completed by September, 1952. Total cost: approximately $985,000. | |
| 328 | Special to: The Waterloo Courier Public Relations News Release 1951:192, p.1 |
Contracts on the cross-campus heating tunnel which will carry heat to North Hall and the conduit heating line to the new campus school were let in the fall of 1951. Tunnel contracts will be nearing completion by Jan 1, 1952. | |
| 329 | Special to: The Waterloo Courier Public Relations News Release 1951:192, p.1 |
Heating plant expansion program consisting of a new boiler and turbine generating unit with accessories, started in the spring of 1950, should be practically completed by Jan. 1, 1952. Total cost: approximately $650,000. | |
| 330 | Contracts for a tunnel construction job will not be let until August 4 Public Relations News Release 1950:426, p.1 |
Business Manager Philip C. Jennings said the proposed 840-foot tunnel will house heating pipes from the heating plant to the new women's residence hall. Six bids will be considered said Jennings. | |
| 331 | Construction Public Relations News Release 1950:402, p.1 |
The face of the campus also took on changes during the year. A $655,000 expansion of the heating and power plant, begun over a year ago, is still under construction. The project includes new offices for the buildings and grounds department. | |
| 332 | Adjustments totaling $122,520, due to delays, were awarded to three firms contracted to build Unit A of a new Campus Laboratory School Public Relations News Release 1950:394, p.1 |
The firms are Viggo Jensen company of Albert Lea, Minnesota; W. A. Peck Company, Des Moines; and Cedar Rapids Electric Company, Cedar Rapids. A Chicago consulting firm made a soil study last fall after construction was stopped due to unstable soil. | |
| 333 | Will begin construction soon on Unit A of Campus School College Eye 41:36, p.1 |
Cost of the project has been estimated to be $920,000 and includes classrooms and offices for nursery school through sixth grade. | |
| 334 | Carpenters discover 1902 grammar lesson College Eye 41:13, p.3 |
The lessons were found on the old black plaster walls of the audio-visual aid laboratory. | |
| 335 | State approves appropriation bill College Eye 40:29, p.3 |
Capital improvements included. | |
| 336 | Modern campus school will have kitchens, lunchroom, swimming pools College Eye 40:16, p.1 |
Description of the proposed new Campus School; hope to begin construction soon. | |
| 337 | Industrial Arts Building annex near completion College Eye 40:1, p.7 |
Arts & Industries Building should be done by January 1, 1949. | |
| 338 | New buildings near completion College Eye 40:1, p.6 |
Arts & Industries Building should be completed by end of year; temporary building under construction between Vocational Building and Nursery School. | |
| 339 | Around the Campus College Eye 39:24, p.2 |
Comments on the difficulty of freshman English classes; warmer weather is appreciated by those living in Sunset Village. | |
| 340 | Lawther annex is near completion College Eye 39:24, p.1 |
Report of construction progress; should be completed by June. | |
| 341 | Plan construction of new Campus School says Price College Eye 39:14, p.1 |
Plans underway; $560,000 appropriated; description of new facilities; A & I foundation complete; Lawther Hall addition nearing completion. | |
| 342 | Temporary building will be erected here soon College Eye 39:11, p.3 |
Will be built just north of Vocational Building; will be 25 X 100 feet; will house three classrooms. | |
| 343 | Construction on arts home begun College Eye 39:5, p.4 |
Ground broken October 11, 1947; excavation underway. | |
| 344 | Begin construction of Lawther Hall wing to house 200 women College Eye 38:35, p.5 |
Work on the $441,000 project began this week; description of the facilities. | |
| 345 | FWA to construct one-story temporary classroom buildings College Eye 38:35, p.3 |
Will erect two temporary buildings for classroom and laboratory space. | |
| 346 | Commerce, science get new buildings College Eye 38:28, p.1 |
Will build two temporary surplus buildings south of 27th Street for science, business education, and industrial arts. | |
| 347 | Building program planned Public Relations News Release 1945:306, p.1 |
The first buildings, using state funds, since 1925 will be a new Campus Laboratory School, College Hospital, Arts and Industries Building, and a Garage Building. The General Assembly has approve $905,000 for the projects. | |
| 348 | New building construction Public Relations News Release 1945:305, p.1 |
$905,000 has been appropriated by the General Assembly for construction of a new Campus Laboratory School, an Arts and Industries Building, a College Health Service and Hospital Building, and a Garage Building. | |
| 349 | College asks for buildings; repairs and replacements also wanted College Eye 36:12, p.1 |
President Price outlines building and repair program to accommodate postwar enrollment. | |
| 350 | More midnight oil furnished by new turbo-dynamo College Eye 31:5, p.4 |
1000kw dynamo added to existing 625kw unit; installation scheduled to be completed November 21; should go into service at beginning of 1940. | |
| 351 | Stadium completion uncertain College Eye 31:2, p.4 |
Final interior work has yet to be completed. | |
| 352 | Dormitory progress College Eye 30:35, p.3 |
Hope to complete work during fall 1939 term. | |
| 353 | Contract calls for indoor track College Eye 30:34, p.5 |
New addition to the football stadium which will provide twice the seating capacity and house an indoor track; description of improvements; will cost $75,000. | |
| 354 | Kucharo's sky-rider builds new women's dormitory College Eye 30:13, p.5 |
Working on the women's dormitory structure; photo. | |
| 355 | The builder Alumnus 22:4, p. |
Worker on steel girder in Seerley Hall for Men; photo. | |
| 356 | President O. R. Latham Alumnus 0:0, p.4 |
President Latham completes his tenth year in office; brief summary of his accomplishments; photo. | |
| 357 | Dear Mr. Editor College Eye 29:25, p.2 |
Allie the Alligator expresses concern over his fate and his home. | |
| 358 | Seerley Hall plastered; paint next College Eye 29:21, p.1 |
Description of the new building; will be at least two months before it is ready for use; photo. | |
| 359 | Pool construction complete soon College Eye 29:11, p.1 |
Should be ready in a month; brief description of the facilities. | |
| 360 | Maze of blueprints reveals building progress College Eye 29:7, p.1 |
Report of progress on Seerley Hall for Men and the Women's Gymnasium swimming pool; hope to complete Seerley Hall by May 1, 1938; photo. | |
| 361 | New dorm, pool well under way College Eye 29:1, p.5 |
New Seerley Hall for Men should be completed by May 1938; swimming pool adjacent to Women's Gymnasium should be ready by December 1937. | |
| 362 | Trucks roar at Seerley Hall College Eye 28:42, p.1 |
Construction progressing on Seerley Hall for Men and the women's swimming pool. | |
| 363 | New brick laundry is being erected behind Baker Hall College Eye 28:4, p.1 |
Total value of building and equipment will be about $25,000; may be complete by December. | |
| 364 | Lighting, paving among campus improvements Alumnus 20:4, p.18 |
Improvements include new stadium, laundry building, greenhouse; roof repairs; gateway south of Men's Gym; paving; new outdoor lighting system; and landscaping. | |
| 365 | Rebuilding of ruined grandstand starts College Eye 28:1, p.1 |
Excavation work for new stadium has begun; photo. | |
| 366 | Campus-wide improvements move forward; seven separate projects approximating $60,000 under way College Eye 27:11, p.1 |
Survey of construction projects and improvements. | |
| 367 | Campus canoeing pool nearing completion College Eye 27:3, p.4 |
Now landscaping banks. | |
| 368 | Modern features re-new Gilchrist College Eye 27:20, p.1 |
||
| 369 | New tennis courts soon to be ready College Eye 27:20, p.6 |
Awaiting installation of nets. | |
| 370 | Progress; college grows during past seven years, offices, buildings, campus improved College Eye 27:20, p.2 |
Quick survey of campus construction over the last few years. | |
| 371 | New tennis courts nearing completion; plan skating rink College Eye 27:14, p.4 |
Women's courts should be completed in October; will build putting green; hope to pave men's courts in several years. | |
| 372 | Sport Shorts College Eye 27:3, p.6 |
Briefly comments on the football team and upcoming game, the new tennis courts, and recreational swimming. | |
| 373 | Work progressing on new dormitory College Eye 27:14, p.4 |
Report on progress on Baker Hall; should be enclosed for the cold weather season. | |
| 374 | The new Laykold net courts being rapidly completed College Eye 27:12, p.4 |
Will provide good all-weather conditions. | |
| 375 | Campus building program nears peak for 1935 College Eye 27:51, p.1 |
Baker Hall to be built; Gilchrist chapel will be remodeled into little theater; ten new tennis courts will be built; landscaping and sidewalks. | |
| 376 | Remodeling provides commercial offices College Eye 27:51, p.3 |
Mathematics will have use of second floor of Old Administration Building; Commercial Education will use third floor. | |
| 377 | The buliding and reconstruction schedule is nearing its peak for 1935 Public Relations News Release 1934:1126, p.1 |
Four projects are in the process of completion. | |
| 378 | College rebuilds grounds in 1934; alterations, repairs change appearance of buildings College Eye 26:25, p.1 |
Description of changes to the campus. | |
| 379 | Longer class intervals, credit rule, administrative changes top events in campus news; departmental and campus alterations are also recent changes College Eye 26:12, p.1 |
Will allow ten minutes of passage time instead of five minutes; changes in music and language departments; landscaping in central campus after demolition of Power Plant. | |
| 380 | Campus remodeling under way Alumnus 18:3, p.10 |
Central campus area, formerly occupied by heating plant and parking lot, will be landscaped; street encircling area will be paved; offices will be remodeled to meet new administrative needs. | |
| 381 | New commons building nearly complete Public Relations News Release 1932:345, p.1 |
the $250,000 building is nearly complete except for interior finishing work and landscaping. It will be ready for use at the opening of the fall term, September 11. Photo. | |
| 382 | Plaster work in Commons is completed; general contract is to be completed by July 26 College Eye 25:4, p.1 |
Other interior work remains to be done; should be complete for fall term. | |
| 383 | Weather retards work on Commons College Eye 24:19, p.4 |
Work suspended until weather improves; brick work underway; target completion date is late July 1933. | |
| 384 | Builders start walls of Commons Monday College Eye 24:7, p.5 |
Excavation and foundation work took seven weeks; masonry work now under way. | |
| 385 | Remodeling an building program Alumnus 16:4, p.10 |
Heating plant should be ready for use by October 1, 1932; Commons may be ready by May 1933; other smaller remodeling projects underway. | |
| 386 | High school gets new stage settings, seats, repainting College Eye 24:2, p.6 |
Several remodeling and building projects underway; Power Plant should be ready October 1. | |
| 387 | Construction of Commons to be complete by May; contracts are awarded to three Iowa building companies College Eye 24:1, p.1 |
Anderson Construction of Council Bluffs is the general contractor for the $200,000 project; description of the facilities; work began on August 10, 1932. | |
| 388 | Improvements are completed in Central Hall College Eye 24:1, p.1 |
Description of extensive remodeling project including changes for the Department of Music. | |
| 389 | Construction on Commons is to be started soon; contracts are awarded to three Iowa building companies College Eye 23:53, p.1 |
Should begin within two weeks; Anderson Construction is general contractor; budget is about $200,000; hope to complete work by May 10, 1933. | |
| 390 | Cause of economic slump is unearthed on local campus College Eye 23:52, p.4 |
Workers find change while fixing sidewalks. | |
| 391 | Steam distributor will be installed College Eye 23:50, p.4 |
Large pit excavated for connections to campus steam tunnels. | |
| 392 | Screens placed on Campanile keep out birds College Eye 23:49, p.1 |
Campanile undergoes repairs after damage to Fasoldt mechanism; roof repaired, electricity installed to operate chimes, clock mechanism shielded, heat will be furnished, and screens installed. | |
| 393 | Will be ready October first College Eye 23:49, p.4 |
Artist's rendition of the finished heating plant. | |
| 394 | Heating plant puzzles co-ed reporter; pleasure trip turns out to be assignment and nets this story as result College Eye 23:48, p.2 |
A look at the new Power Plant, now under construction. | |
| 395 | Grandstands will be built this summer; football seats will more than double capacity of the stadium College Eye 23:45, p.1 |
Will also make improvements to Central Hall and put in new sidewalks. | |
| 396 | College Commons plans are approved by Iowa State Board of Education College Eye 23:38, p.1 |
Approve preliminary work of architects; hope to done by end of spring term 1933. | |
| 397 | Complete renovation of Placement Bureau offices is finished College Eye 23:34, p.1 |
New quarters doubled in size. | |
| 398 | Preliminary plans for college Commons are now complete; construction will begin July 1 College Eye 23:34, p.1 |
Description of the new facility. | |
| 399 | Preliminary plans for the college commons Public Relations News Release 1931:249, p.1 |
Awaiting final approval at Board meeting in April; construction may begin July 1, 1932; detailed description of facilities; Proudfoot, Rawson, Souers, and Thomas are architects. | |
| 400 | Heating plant here will be finished soon; equipment installation begun, states Supt. E. E. Cole; contracts are granted for varied types of apparatus College Eye 23:33, p.1 |
Installation of technical equipment now under way; hope to be ready by October. |