Construction

Displaying 301 - 400 of 474
# Title Date Summary
301 The emerging new face of SCI
College Eye 60:5, p.5
Photos showing changes that have been made on campus.
302 Zealous coeds to walk more when residing in new hall
College Eye 59:10, p.5
A look at construction projects proposed or underway.
303 Library completion expected in April
College Eye 58:14, p.3
Good weather has helped construction of new Library, Administration Building, addition to Campbell Hall, and Shull Hall.
304 Two construction projects to be completed by Fall
College Eye 57:39, p.3
Work continuing on Library, Campbell Hall addition, new seating in O. R. Latham Stadium, and Shull Hall; photo.
305 Library proceeds as scheduled
College Eye 57:25, p.4
Full crew at work again after cold weather.
306 'Library construction on schedule,' Mr. Rod
College Eye 57:14, p.3
Old heating tunnel removed and new tunnel built; lower level almost completely enclosed; will enable work to continue even during bad weather; photo.
307 Pickets and work stoppages on new library called off
College Eye 57:11, p.8
High pressure pipe installed; will lower tunnel sections and work as long as weather permits.
308 Strike may delay library construction
College Eye 57:10, p.1
Work has been stopped several times; need to get steam tunnels hooked up soon or work may be halted until spring.
309 Students, too, concerned with library work stoppage
College Eye 57:10, p.2
Construction workers stop working because of low wages and concerns of lost time are brought up.
310 Workers back on job Tuesday after strike
College Eye 57:9, p.7
Construction of new library building halted briefly after plumbers picket.
311 Excavation is really a library
College Eye 57:7, p.2
The mess from construction is due to the construction of the new library.
312 Legislator visits ISTC campus
Public Relations News Release 1960:246, p.1
Representative John M. Ely, Jr. visits the Teachers College campus, where he attends the Administrative Council Luncheon and observes the construction of four new buildings.
313 Construction is progressing
College Eye 52:16, p.1
Work underway on Student Health Center, Music Building, Arts and Industries Building, Rider Hall, and other additions and repairs.
314 Construction and remodeling at ISTC
Public Relations News Release 1960:173, p.1
A music education building, men's dormitory, the Health Center, and an Arts and Industries addition are contracted. Improvements to the heating plant, remodeling of the auditorium, and a greenhouse extension are planned.
315 Expansion program booms
College Eye 52:3, p.4
Detailed look at proposed construction in the next few years; map.
316 Untitled
College Eye 52:3, p.3
Construction workers examine plans for the new health center; photo.
317 Contracts awarded for I. S. T. C. dormitory
Public Relations News Release 1960:8, p.1
Construction contracts are awarded for a new dormitory after the confirmation of financial arrangements by the Board of Regents. The new building will be located south of the men's gymnasium, and will support up to four-hundred students.
318 Iowa legislators visit campus today to view construction
College Eye 51:38, p.1
319 Legislature appropriates $2,572,250; substantial start on building program
Alumnus 44:2, p.2
New buildings will include a health services facility and a music building; an addition to Arts and Industries; improvements to infrastructure; new dorm also approved; photo.
320 Six classrooms updated in campus improvement jobs
Alumnus 44:1, p.12
Significant improvements in infrastructure include increased water pressure, electricity upgrades, paving, removal of coal train railroad tracks, and athletic facilities near new Campus School.
321 TC campus seems cluttered with much mole-like activity
College Eye 49:5, p.8
Construction under way on tunnels and on drainage tiles around Wright Hall and the Women's Gymnasium.
322 Iowa lags in college building program
College Eye 49:1, p.1
President Maucker shows that Iowa colleges need new buildings.
323 No funds--no building at TC; veto postpones TC plans for campus construction
College Eye 49:1, p.1
Governor Loveless vetoes appropriations bill; President Maucker hopes for special session; photo.
324 Leading It Out
College Eye 46:37, p.2
Construction on campus, re-naming of State Board of Education, and Bermuda shorts leave Ricki Ridali with little left to write about.
325 Untitled
College Eye 43:37, p.2
Discouraged by the need for a separate outhouse for construction workers on campus; asks for equality.
326 Special To: the Waterloo Courier
Public Relations News Release 1951:307, p.1
North Hall, new girls' dormitory, should be completed in the spring of 1952. Construction started in the spring of 1950. Total Cost: $915,000.
327 Special to: The Waterloo Courier
Public Relations News Release 1951:192, p.1
Construction on the elementary wing of the new campus laboratory, which began in the summer of 1951, school should be approximately completed by September, 1952. Total cost: approximately $985,000.
328 Special to: The Waterloo Courier
Public Relations News Release 1951:192, p.1
Contracts on the cross-campus heating tunnel which will carry heat to North Hall and the conduit heating line to the new campus school were let in the fall of 1951. Tunnel contracts will be nearing completion by Jan 1, 1952.
329 Special to: The Waterloo Courier
Public Relations News Release 1951:192, p.1
Heating plant expansion program consisting of a new boiler and turbine generating unit with accessories, started in the spring of 1950, should be practically completed by Jan. 1, 1952. Total cost: approximately $650,000.
330 Contracts for a tunnel construction job will not be let until August 4
Public Relations News Release 1950:426, p.1
Business Manager Philip C. Jennings said the proposed 840-foot tunnel will house heating pipes from the heating plant to the new women's residence hall. Six bids will be considered said Jennings.
331 Construction
Public Relations News Release 1950:402, p.1
The face of the campus also took on changes during the year. A $655,000 expansion of the heating and power plant, begun over a year ago, is still under construction. The project includes new offices for the buildings and grounds department.
332 Adjustments totaling $122,520, due to delays, were awarded to three firms contracted to build Unit A of a new Campus Laboratory School
Public Relations News Release 1950:394, p.1
The firms are Viggo Jensen company of Albert Lea, Minnesota; W. A. Peck Company, Des Moines; and Cedar Rapids Electric Company, Cedar Rapids. A Chicago consulting firm made a soil study last fall after construction was stopped due to unstable soil.
333 Will begin construction soon on Unit A of Campus School
College Eye 41:36, p.1
Cost of the project has been estimated to be $920,000 and includes classrooms and offices for nursery school through sixth grade.
334 Carpenters discover 1902 grammar lesson
College Eye 41:13, p.3
The lessons were found on the old black plaster walls of the audio-visual aid laboratory.
335 State approves appropriation bill
College Eye 40:29, p.3
Capital improvements included.
336 Modern campus school will have kitchens, lunchroom, swimming pools
College Eye 40:16, p.1
Description of the proposed new Campus School; hope to begin construction soon.
337 Industrial Arts Building annex near completion
College Eye 40:1, p.7
Arts & Industries Building should be done by January 1, 1949.
338 New buildings near completion
College Eye 40:1, p.6
Arts & Industries Building should be completed by end of year; temporary building under construction between Vocational Building and Nursery School.
339 Around the Campus
College Eye 39:24, p.2
Comments on the difficulty of freshman English classes; warmer weather is appreciated by those living in Sunset Village.
340 Lawther annex is near completion
College Eye 39:24, p.1
Report of construction progress; should be completed by June.
341 Plan construction of new Campus School says Price
College Eye 39:14, p.1
Plans underway; $560,000 appropriated; description of new facilities; A & I foundation complete; Lawther Hall addition nearing completion.
342 Temporary building will be erected here soon
College Eye 39:11, p.3
Will be built just north of Vocational Building; will be 25 X 100 feet; will house three classrooms.
343 Construction on arts home begun
College Eye 39:5, p.4
Ground broken October 11, 1947; excavation underway.
344 Begin construction of Lawther Hall wing to house 200 women
College Eye 38:35, p.5
Work on the $441,000 project began this week; description of the facilities.
345 FWA to construct one-story temporary classroom buildings
College Eye 38:35, p.3
Will erect two temporary buildings for classroom and laboratory space.
346 Commerce, science get new buildings
College Eye 38:28, p.1
Will build two temporary surplus buildings south of 27th Street for science, business education, and industrial arts.
347 Building program planned
Public Relations News Release 1945:306, p.1
The first buildings, using state funds, since 1925 will be a new Campus Laboratory School, College Hospital, Arts and Industries Building, and a Garage Building. The General Assembly has approve $905,000 for the projects.
348 New building construction
Public Relations News Release 1945:305, p.1
$905,000 has been appropriated by the General Assembly for construction of a new Campus Laboratory School, an Arts and Industries Building, a College Health Service and Hospital Building, and a Garage Building.
349 College asks for buildings; repairs and replacements also wanted
College Eye 36:12, p.1
President Price outlines building and repair program to accommodate postwar enrollment.
350 More midnight oil furnished by new turbo-dynamo
College Eye 31:5, p.4
1000kw dynamo added to existing 625kw unit; installation scheduled to be completed November 21; should go into service at beginning of 1940.
351 Stadium completion uncertain
College Eye 31:2, p.4
Final interior work has yet to be completed.
352 Dormitory progress
College Eye 30:35, p.3
Hope to complete work during fall 1939 term.
353 Contract calls for indoor track
College Eye 30:34, p.5
New addition to the football stadium which will provide twice the seating capacity and house an indoor track; description of improvements; will cost $75,000.
354 Kucharo's sky-rider builds new women's dormitory
College Eye 30:13, p.5
Working on the women's dormitory structure; photo.
355 The builder
Alumnus 22:4, p.
Worker on steel girder in Seerley Hall for Men; photo.
356 President O. R. Latham
Alumnus 0:0, p.4
President Latham completes his tenth year in office; brief summary of his accomplishments; photo.
357 Dear Mr. Editor
College Eye 29:25, p.2
Allie the Alligator expresses concern over his fate and his home.
358 Seerley Hall plastered; paint next
College Eye 29:21, p.1
Description of the new building; will be at least two months before it is ready for use; photo.
359 Pool construction complete soon
College Eye 29:11, p.1
Should be ready in a month; brief description of the facilities.
360 Maze of blueprints reveals building progress
College Eye 29:7, p.1
Report of progress on Seerley Hall for Men and the Women's Gymnasium swimming pool; hope to complete Seerley Hall by May 1, 1938; photo.
361 New dorm, pool well under way
College Eye 29:1, p.5
New Seerley Hall for Men should be completed by May 1938; swimming pool adjacent to Women's Gymnasium should be ready by December 1937.
362 Trucks roar at Seerley Hall
College Eye 28:42, p.1
Construction progressing on Seerley Hall for Men and the women's swimming pool.
363 New brick laundry is being erected behind Baker Hall
College Eye 28:4, p.1
Total value of building and equipment will be about $25,000; may be complete by December.
364 Lighting, paving among campus improvements
Alumnus 20:4, p.18
Improvements include new stadium, laundry building, greenhouse; roof repairs; gateway south of Men's Gym; paving; new outdoor lighting system; and landscaping.
365 Rebuilding of ruined grandstand starts
College Eye 28:1, p.1
Excavation work for new stadium has begun; photo.
366 Campus-wide improvements move forward; seven separate projects approximating $60,000 under way
College Eye 27:11, p.1
Survey of construction projects and improvements.
367 Campus canoeing pool nearing completion
College Eye 27:3, p.4
Now landscaping banks.
368 Modern features re-new Gilchrist
College Eye 27:20, p.1
369 New tennis courts soon to be ready
College Eye 27:20, p.6
Awaiting installation of nets.
370 Progress; college grows during past seven years, offices, buildings, campus improved
College Eye 27:20, p.2
Quick survey of campus construction over the last few years.
371 New tennis courts nearing completion; plan skating rink
College Eye 27:14, p.4
Women's courts should be completed in October; will build putting green; hope to pave men's courts in several years.
372 Sport Shorts
College Eye 27:3, p.6
Briefly comments on the football team and upcoming game, the new tennis courts, and recreational swimming.
373 Work progressing on new dormitory
College Eye 27:14, p.4
Report on progress on Baker Hall; should be enclosed for the cold weather season.
374 The new Laykold net courts being rapidly completed
College Eye 27:12, p.4
Will provide good all-weather conditions.
375 Campus building program nears peak for 1935
College Eye 27:51, p.1
Baker Hall to be built; Gilchrist chapel will be remodeled into little theater; ten new tennis courts will be built; landscaping and sidewalks.
376 Remodeling provides commercial offices
College Eye 27:51, p.3
Mathematics will have use of second floor of Old Administration Building; Commercial Education will use third floor.
377 The buliding and reconstruction schedule is nearing its peak for 1935
Public Relations News Release 1934:1126, p.1
Four projects are in the process of completion.
378 College rebuilds grounds in 1934; alterations, repairs change appearance of buildings
College Eye 26:25, p.1
Description of changes to the campus.
379 Longer class intervals, credit rule, administrative changes top events in campus news; departmental and campus alterations are also recent changes
College Eye 26:12, p.1
Will allow ten minutes of passage time instead of five minutes; changes in music and language departments; landscaping in central campus after demolition of Power Plant.
380 Campus remodeling under way
Alumnus 18:3, p.10
Central campus area, formerly occupied by heating plant and parking lot, will be landscaped; street encircling area will be paved; offices will be remodeled to meet new administrative needs.
381 New commons building nearly complete
Public Relations News Release 1932:345, p.1
the $250,000 building is nearly complete except for interior finishing work and landscaping. It will be ready for use at the opening of the fall term, September 11. Photo.
382 Plaster work in Commons is completed; general contract is to be completed by July 26
College Eye 25:4, p.1
Other interior work remains to be done; should be complete for fall term.
383 Weather retards work on Commons
College Eye 24:19, p.4
Work suspended until weather improves; brick work underway; target completion date is late July 1933.
384 Builders start walls of Commons Monday
College Eye 24:7, p.5
Excavation and foundation work took seven weeks; masonry work now under way.
385 Remodeling an building program
Alumnus 16:4, p.10
Heating plant should be ready for use by October 1, 1932; Commons may be ready by May 1933; other smaller remodeling projects underway.
386 High school gets new stage settings, seats, repainting
College Eye 24:2, p.6
Several remodeling and building projects underway; Power Plant should be ready October 1.
387 Construction of Commons to be complete by May; contracts are awarded to three Iowa building companies
College Eye 24:1, p.1
Anderson Construction of Council Bluffs is the general contractor for the $200,000 project; description of the facilities; work began on August 10, 1932.
388 Improvements are completed in Central Hall
College Eye 24:1, p.1
Description of extensive remodeling project including changes for the Department of Music.
389 Construction on Commons is to be started soon; contracts are awarded to three Iowa building companies
College Eye 23:53, p.1
Should begin within two weeks; Anderson Construction is general contractor; budget is about $200,000; hope to complete work by May 10, 1933.
390 Cause of economic slump is unearthed on local campus
College Eye 23:52, p.4
Workers find change while fixing sidewalks.
391 Steam distributor will be installed
College Eye 23:50, p.4
Large pit excavated for connections to campus steam tunnels.
392 Screens placed on Campanile keep out birds
College Eye 23:49, p.1
Campanile undergoes repairs after damage to Fasoldt mechanism; roof repaired, electricity installed to operate chimes, clock mechanism shielded, heat will be furnished, and screens installed.
393 Will be ready October first
College Eye 23:49, p.4
Artist's rendition of the finished heating plant.
394 Heating plant puzzles co-ed reporter; pleasure trip turns out to be assignment and nets this story as result
College Eye 23:48, p.2
A look at the new Power Plant, now under construction.
395 Grandstands will be built this summer; football seats will more than double capacity of the stadium
College Eye 23:45, p.1
Will also make improvements to Central Hall and put in new sidewalks.
396 College Commons plans are approved by Iowa State Board of Education
College Eye 23:38, p.1
Approve preliminary work of architects; hope to done by end of spring term 1933.
397 Complete renovation of Placement Bureau offices is finished
College Eye 23:34, p.1
New quarters doubled in size.
398 Preliminary plans for college Commons are now complete; construction will begin July 1
College Eye 23:34, p.1
Description of the new facility.
399 Preliminary plans for the college commons
Public Relations News Release 1931:249, p.1
Awaiting final approval at Board meeting in April; construction may begin July 1, 1932; detailed description of facilities; Proudfoot, Rawson, Souers, and Thomas are architects.
400 Heating plant here will be finished soon; equipment installation begun, states Supt. E. E. Cole; contracts are granted for varied types of apparatus
College Eye 23:33, p.1
Installation of technical equipment now under way; hope to be ready by October.